WELL · 42-399-33106 · DISTRICT 7
Pruser G. W. #3
Runnels County · GWP (Goen) field · Vertical
Pruser G. W. #3 (API 42-399-33106) is a plugged well in Runnels County, plugged January 8, 1999, last operated by Enrich Oil Corporation.
The RRC has issued 2 drilling permits between 1984 and 1996, permitted to 4,700 ft.
Completion filings report 4 formation tops, including T/Palo Pinto A, T/Palo Pinto Lm., T/Palo Pinto B, T/Goen Reef.
Its 2 leases have reported 16.9K barrels of oil and 23.2K mcf of gas since January 1993, last reporting in May 1999. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Jan 4, 2026 · 529 permits on file · (325) 668-3812
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enrich Oil Corporation |
| Production reports | Enrich Oil Corporationthrough Aug 1998 |
| Latest permit | Enrich Oil CorporationFeb 8, 1996 |
- 4,700
- total depth, ft
- 2
- permits on file
- Feb 8, 1996
- last permit issued
- Feb 25, 1984
- completed
- 16.9K
- cumulative oil, bbl
- 23.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 25, 1984
- Shut in
- —
- Plugged
- Jan 8, 1999
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pruser, G.W. O-9-14319 | Chayo (Palo Pinto 3750) | Enrich Oil Corporation | 1 | 11.9K | 19K | Feb 1996 – May 1999 |
| Pruser, G. W. O-9-8766 | GWP (Goen) | Enrich Oil Corporation | 3 | 5.06K | 4.24K | Jan 1993 – Feb 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enrich Oil CorporationJan 1993 → Aug 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 444597-99 | Recompletion | Enrich Oil Corporation | Feb 8, 1996 | Feb 8, 1996 | Jan 29, 1996 | 4,253 |
| 227680-99 | Drill | Enrich Oil Corporation | Dec 30, 1983 | Jan 6, 1984 | — | 4,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-8766 | — | — | — | — |
| — | — O-9-14319 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,892 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Palo Pinto A | 3,813 | -1,921 |
| T/Palo Pinto Lm. | 3,813 | -1,921 |
| T/Palo Pinto B | 3,837 | -1,945 |
| T/Goen Reef | 4,247 | -2,355 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,837 | 3,844 | Perforated |
| 4,247 | 4,253 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 161 | 11 | 85 S |
| 5.5 | 4,247 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 5, 1996 | Feb 12, 1996 | Yes |
| 00 | Feb 22, 1996 | Mar 1, 1984 | — |
| 00 | Apr 12, 1984 | Mar 1, 1984 | — |
| 00 | Mar 7, 1984 | Mar 1, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33106 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33106 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933106, documented in the API reference.