WELL · 42-399-33108 · DISTRICT 7
Clayton 138 #1
Runnels County · Loco Rico (Gardner-A) field · Vertical
Clayton 138 #1 (API 42-399-33108) is a plugged well in Runnels County, plugged February 9, 1996, last operated by Mid-Tex Energy Inc..
The RRC has issued one drilling permit, issued December 30, 1983, permitted to 4,300 ft.
It was permitted by Barbee, Inc. and has since transferred to Mid-Tex Energy Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Top Coleman Jct., Dog Bend Lime, Caps Lime, Lower Fry Sand.
Operator of record
Permitted by Barbee, Inc.; the EWA schedule now lists a different operator.
Costa Mesa, CA · P-5 Inactive, filed Sep 18, 1998 · 102 permits on file · (714) 444-1964
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mid-Tex Energy Inc. |
| Production reports | Mid-Tex Energy Inc.through Aug 1995 |
| Latest permit | Barbee, Inc.Dec 30, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,300
- total depth, ft
- 1
- permits on file
- Dec 30, 1983
- last permit issued
- Feb 23, 1984
- completed
- 0
- cumulative oil, bbl
- 15.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 23, 1984
- Shut in
- —
- Plugged
- Feb 9, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clayton 138 G-9-110304 | Loco Rico (Gardner-A) | Mid-Tex Energy Inc. | 1 | 0 | 15.4K | Jan 1993 – Feb 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Barbee, Inc.Jan 1993 → Apr 1995
- 2Mid-Tex Energy Inc.Jun 1995 → Aug 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 225469-99 | Drill | Barbee, Inc. | Dec 20, 1983 | Dec 30, 1983 | — | 4,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-110304 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,810 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Top Coleman Jct. | 1,105 | 705 |
| Dog Bend Lime | 3,302 | -1,492 |
| Caps Lime | 3,422 | -1,612 |
| Lower Fry Sand | 3,453 | -1,643 |
| Jennings Sand | 3,622 | -1,812 |
| Gardner Sand | 3,638 | -1,828 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,638 | 3,641 | Perforated |
| 3,651 | 3,658 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 125 | 11 | 100 S |
| 4.5 | 3,804 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 31, 1984 | May 1, 1984 | — |
| 00 | May 15, 1984 | May 1, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33108 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33108 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933108, documented in the API reference.