WELL · 42-399-33243 · DISTRICT 7
Sansom "A" #2A
Runnels County · Vertical
Sansom "A" #2A (API 42-399-33243) is a permitted well in Runnels County filed by O-B Oils, Inc.; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1984 and 1985, permitted to 4,900 ft.
Completion filings report 2 formation tops, including Gardner, Ellenburger.
Its 2 leases have reported 1.24K barrels of oil and 17 mcf of gas since January 1993, last reporting in August 2003. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed May 7, 1994 · 71 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Thornton Oil Co., Inc.through Apr 1995 |
| Latest permit | O-B Oils, Inc.Jan 18, 1985 |
- 4,900
- total depth, ft
- 3
- permits on file
- Jan 18, 1985
- last permit issued
- —
- completed
- 1.24K
- cumulative oil, bbl
- 17
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sansom "A" O-8-18886 | Goldsboro (Gardner) | Thornton Oil Co., Inc. | 2 | 1.24K | 17 | Jan 1993 – Aug 2003 |
| Sansom "B" O-8-25616 | Goldsboro (Gardner) | R & P Operating | 1 | 0 | 0 | Jan 1993 – Mar 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1R & P OperatingJan 1993 → Sep 1993
- 2Thornton Oil Co.Oct 1993 → Jan 1994
- 3Thornton Oil Co., Inc.May 1994 → Apr 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 264617-99 | Recompletion | O-B Oils, Inc. | Jan 17, 1985 | Jan 18, 1985 | — | 4,000 |
| 241714-99 | Drill | O-B Oils, Inc. | Jun 11, 1984 | Jun 12, 1984 | — | 4,900 |
| 241713-99 | Drill | O-B Oils, Inc. | Jun 11, 1984 | Jun 12, 1984 | — | 4,900 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-8-18886 | — | — | — | — |
| — | — O-8-25616 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,131 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gardner | 3,954 | -1,823 |
| Ellenburger | 4,608 | -2,477 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,954 | 3,962 | Perforated |
| 4,608 | 4,616 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 140 | 12.5 | 120 S |
| 8.625 | 140 | 12.25 | 120 sx |
| 4.5 | 4,675 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 11, 1993 | — | — |
| 00 | Dec 1, 1989 | — | — |
| 00 | Feb 7, 1985 | Jan 16, 1985 | — |
| 00 | Feb 5, 1985 | — | — |
| 00 | Aug 23, 1984 | Aug 6, 1984 | — |
| 00 | Aug 15, 1984 | Aug 6, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33243 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33243 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933243, documented in the API reference.