WELL · 42-399-33293 · DISTRICT 7
Clearman #1
Runnels County · Sykes West(goen) field · Vertical
Clearman #1 (API 42-399-33293) is a plugged well in Runnels County, plugged May 22, 2015, last operated by Mcrae & Henry Ltd.
The RRC has issued 2 drilling permits between 1984 and 2009, permitted to 4,950 ft.
Completion filings report 4 formation tops, including Palo Pinto, Sykes West (Goen), Jennings Lime, Ellenburger.
Its 2 leases have reported 37.8K barrels of oil and 17.6K mcf of gas since January 1993, last reporting in September 2015. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Golden, CO · P-5 Y, filed Feb 5, 2016 · 11 permits on file · (303) 526-4342
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | McRae & Henry Ltd |
| Production reports | McRae & Henry, Ltdthrough Jan 2015 |
| Latest permit | McRae & Henry, LtdJan 12, 2009 |
- 4,950
- total depth, ft
- 2
- permits on file
- Jan 12, 2009
- last permit issued
- Oct 12, 2008
- completed
- 37.8K
- cumulative oil, bbl
- 17.6K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 12, 2008
- Shut in
- —
- Plugged
- May 22, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Clearman O-9-10941 | Nevins, East (Gray Sand) | McRae & Henry, Ltd | 1 | 37.8K | 17.6K | Jan 1993 – Sep 2015 |
| Clearman O-9-18986 | Sykes,west(goen) | McRae & Henry, Ltd | 1 | 11 | 0 | Jul 2013 – Aug 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McRae & Henry, LtdJan 1993 → Jan 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 676301-99 | Recompletion | McRae & Henry, Ltd | Dec 12, 2008 | Jan 12, 2009 | Sep 22, 2008 | 4,138 |
| 247903-99 | Drill | TXO Production Corp. | Aug 9, 1984 | Aug 9, 1984 | — | 4,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-10941 | — | — | — | — |
| — | — O-9-18986 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,868 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO LIME | 3,380 | -1,512 |
| Sykes West (Goen) | 3,860 | -1,992 |
| Jennings Lime | 3,940 | -2,072 |
| Ellenburger | 4,581 | -2,713 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,860 | 3,866 | Perforated |
| 4,200 | 4,208 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 156 | 12.25 | 125 S |
| 4.5 | 4,798 | 7.875 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 2015 | Dec 8, 2008 | — |
| 00 | Aug 6, 2015 | — | — |
| 00 | Oct 25, 1984 | Sep 21, 1984 | — |
| 00 | Oct 10, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33293 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33293 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933293, documented in the API reference.