WELL · 42-399-33487 · DISTRICT 7
Clearman #3
Runnels County · Gerlach (Ellenburger) field · Vertical
Clearman #3 (API 42-399-33487) is a plugged well in Runnels County, plugged June 3, 1988, last operated by Buffalo Gap Production Inc.
The RRC has issued one drilling permit, issued March 12, 1985, permitted to 5,000 ft.
It was permitted by Thomas Operating CO., Inc. and has since transferred to Buffalo Gap Production Inc on the wellbore schedule.
Completion filings report 6 formation tops, including Mcmillin, Palo Pinto, Gardner Sand, Gray.
Operator of record
Permitted by Thomas Operating Co., Inc.; the EWA schedule now lists a different operator.
Odessa, TX · P-5 Y, filed May 15, 1989 · 4 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Buffalo Gap Production Inc |
| Production reports | none |
| Latest permit | Thomas Operating Co., Inc.Mar 12, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 1
- permits on file
- Mar 12, 1985
- last permit issued
- Mar 23, 1985
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 23, 1985
- Shut in
- —
- Plugged
- Jun 3, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 269114-99 | Drill | Thomas Operating Co., Inc. | Mar 11, 1985 | Mar 12, 1985 | Mar 12, 1985 | 5,000 |
Formation tops
As filed on W-2/G-1. Subsea from 1,869 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| McMillin | 2,898 | -1,029 |
| Palo Pinto | 3,330 | -1,461 |
| Gardner Sand | 3,976 | -2,107 |
| Gray | 4,184 | -2,315 |
| Caddo | 4,335 | -2,466 |
| Ellenburger | 4,564 | -2,695 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,572 | 4,574 | Perforated |
| 4,580 | 4,590 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 151 | 12.25 | 125 S |
| 4.5 | 4,704 | 7.875 | 685 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 1985 | May 3, 1985 | — |
| 00 | May 10, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33487 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33487 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933487, documented in the API reference.