WELL · 42-399-33530 · DISTRICT 7
Bauer A #1
Runnels County · Winters SW. (Jennings Lime) field · Vertical
Bauer A #1 (API 42-399-33530) is a plugged well in Runnels County, plugged December 3, 1993, last operated by Petro-West Corporation.
The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 4,600 ft.
Completion filings report 6 formation tops, including Palo Pinto, Capps, B/L. Capps, B/Lower Capps.
Its lease has reported 538 barrels of oil and 20 mcf of gas since January 1993, last reporting in March 1994.
Operator of record
Lubbock, TX · P-5 Inactive, filed Jul 11, 2001 · 65 permits on file · (512) 327-7400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Petro-West Corporation |
| Production reports | Petro-West Corporationthrough Oct 1993 |
| Latest permit | Petro-West CorporationJan 12, 1987 |
- 4,600
- total depth, ft
- 2
- permits on file
- Jan 12, 1987
- last permit issued
- Jun 20, 1985
- completed
- 538
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 20, 1985
- Shut in
- —
- Plugged
- Dec 3, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bauer "A" O-9-11771 | Dick Richardson (Palo Pinto,li.) | Petro-West Corporation | 1 | 538 | 20 | Jan 1993 – Mar 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petro-West CorporationJan 1993 → Oct 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 325354-99 | Recompletion | Petro-West Corporation | Jan 12, 1987 | Jan 12, 1987 | — | 4,520 |
| 274721-99 | Drill | Petro-West Corporation | Aug 2, 1985 | May 10, 1985 | May 14, 1985 | 4,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11771 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,816 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,700 | -1,884 |
| Capps | 3,940 | -2,124 |
| B/L. Capps | 4,120 | -2,304 |
| B/Lower Capps | 4,120 | -2,304 |
| T/Jennings | 4,260 | -2,444 |
| Gardner Lime | 4,350 | -2,534 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,706 | 3,716 | Perforated |
| 4,258 | 4,264 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 169 | 12.25 | 130 S |
| 4.5 | 4,427 | 7.875 | 790 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 18, 1987 | Feb 9, 1987 | Yes |
| 00 | Feb 13, 1987 | — | — |
| 00 | Sep 5, 1985 | Jul 26, 1985 | — |
| 00 | Aug 31, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33530 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33530 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.