WELL · 42-399-33862 · DISTRICT 7
Curnutte South #1
Runnels County · Wingate West (Gray) field · Vertical
Curnutte South #1 (API 42-399-33862) is a plugged well in Runnels County, plugged February 16, 1995, last operated by Littlepage Tommy.
The RRC has issued one drilling permit, issued July 16, 1987, permitted to 5,600 ft.
It was permitted by Seago Oil, Inc. and has since transferred to Littlepage Tommy on the wellbore schedule.
Completion filings report 4 formation tops, including Gardner Lime, Gardner Sand, Gray, Odom.
Its lease has reported 1.19K barrels of oil and 5.18K mcf of gas since January 1993, last reporting in March 1995.
Operator of record
Permitted by Seago Oil, Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Apr 5, 2002 · 201 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Littlepage Tommy |
| Production reports | Brazos Petroleum, Inc.through Oct 1994 |
| Latest permit | Seago Oil, Inc.Jul 16, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,600
- total depth, ft
- 1
- permits on file
- Jul 16, 1987
- last permit issued
- Sep 25, 1987
- completed
- 1.19K
- cumulative oil, bbl
- 5.18K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 25, 1987
- Shut in
- —
- Plugged
- Feb 16, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Curnutte South O-9-12297 | Wingate, West (Gray) | Littlepage, Tommy | 1 | 1.19K | 5.18K | Jan 1993 – Mar 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oil Management CorporationJan 1993 → Sep 1994
- 2Brazos Petroleum, Inc.Oct 1994 → Oct 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 332917-99 | Drill | Seago Oil, Inc. | Jul 15, 1987 | Jul 16, 1987 | — | 5,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-12297 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,009 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Gardner Lime | 5,002 | -2,993 |
| Gardner Sand | 5,026 | -3,017 |
| Gray | 5,057 | -3,048 |
| Odom | 5,208 | -3,199 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,084 | 5,090 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 180 | 11 | 90 S |
| 4.5 | 5,575 | 7.875 | 635 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 1987 | Oct 22, 1987 | Yes |
| 00 | Oct 30, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33862 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33862 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933862, documented in the API reference.