WELL · 42-399-33880 · DISTRICT 7
South Winters A #1
Runnels County · Dick Richardson (Gardner Sand) field · Vertical
South Winters A #1 (API 42-399-33880) is a plugged well in Runnels County, plugged August 30, 1989, last operated by Franklin Jack.
The RRC has issued one drilling permit (amended twice), issued August 25, 1987, permitted to 5,000 ft.
It was permitted by Kinlaw Oil Corporation and has since transferred to Franklin Jack on the wellbore schedule.
Completion filings report 3 formation tops, including Palo Pinto, Capps, Caddo.
Operator of record
Permitted by Kinlaw Oil Corporation; the EWA schedule now lists a different operator.
Arlington, TX · P-5 Y, filed Apr 4, 2008 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Franklin Jack |
| Production reports | none |
| Latest permit | Kinlaw Oil CorporationAug 25, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,000
- total depth, ft
- 3
- permits on file
- Aug 25, 1987
- last permit issued
- Oct 26, 1987
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 26, 1987
- Shut in
- —
- Plugged
- Aug 30, 1989
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 335085-97 | Drill | Kinlaw Oil Corporation | Nov 20, 1987 | Aug 25, 1987 | — | 5,000 |
| 335085-98 | Drill | Kinlaw Oil Corporation | Sep 14, 1987 | Aug 25, 1987 | — | 5,000 |
| 335085-99 | Drill | Kinlaw Oil Corporation | Aug 25, 1987 | Aug 25, 1987 | — | 5,000 |
Formation tops
As filed on W-2/G-1. Subsea from 1,820 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,578 | -1,758 |
| Capps | 3,798 | -1,978 |
| Caddo | 4,440 | -2,620 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,225 | 4,234 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 181 | 12.25 | 120 S |
| 4.5 | 4,400 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 2, 1987 | Nov 17, 1987 | Yes |
| 00 | Dec 1, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-33880 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-33880 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39933880, documented in the API reference.