WELL · 42-399-34122 · DISTRICT 7
Curnutte A #1
Runnels County · Wingate West (Gardner) field · Vertical
Curnutte A #1 (API 42-399-34122) is a plugged well in Runnels County, plugged March 3, 1998, last operated by Brazos Petroleum Inc..
The RRC has issued one drilling permit (amended once), issued November 14, 1990, permitted to 5,400 ft.
It was permitted by Oil Management Corp. and has since transferred to Brazos Petroleum Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Capps, Goen, Cardner, Gray.
Its lease has reported 432 barrels of oil and 9.13K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Oil Management Corp.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Jan 4, 2026
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brazos Petroleum Inc. |
| Production reports | Oil Management Corporationthrough Mar 1995 |
| Latest permit | Oil Management Corp.Nov 14, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,400
- total depth, ft
- 2
- permits on file
- Nov 14, 1990
- last permit issued
- Mar 20, 1991
- completed
- 432
- cumulative oil, bbl
- 9.13K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 20, 1991
- Shut in
- —
- Plugged
- Mar 3, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Curnutte "A" O-9-13013 | Wingate, West (Gardner) | Brazos Petroleum, Inc. | 1 | 432 | 9.13K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Oil Management CorporationJan 1993 → Mar 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 380809-98 | Drill | Oil Management Corp. | Mar 21, 1991 | Nov 14, 1990 | Nov 24, 1990 | 5,400 |
| 380809-99 | Drill | Oil Management Corp. | Nov 8, 1990 | Nov 14, 1990 | — | 5,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13013 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,019 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Capps | 4,600 | -2,581 |
| Goen | 4,804 | -2,785 |
| Cardner | 5,074 | -3,055 |
| Gray | 5,138 | -3,119 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,074 | 5,088 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 228 | 12.25 | 150 S |
| 4.5 | 5,240 | 7.875 | 170 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 23, 1991 | Mar 27, 1991 | Yes |
| 00 | Apr 4, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-34122 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-34122 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39934122, documented in the API reference.