WELL · 42-399-34316 · DISTRICT 7
Mallory #1
Runnels County · Saxon (Serratt) field · Vertical
Mallory #1 (API 42-399-34316) is a plugged well in Runnels County, plugged October 1, 1996, last operated by Pace Operating.
The RRC has issued 2 drilling permits (amended once) in 1994, permitted to 3,650 ft.
Completion filings report 4 formation tops, including Serratt, Gunsight, Adams Branch, Jenning Sd.
Its 3 leases have reported 497 barrels of oil and 11 mcf of gas since May 1994, last reporting in November 1996. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed May 4, 2018 · 33 permits on file · (325) 627-5921
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pace Operating |
| Production reports | Pace Operatingthrough Apr 1996 |
| Latest permit | Pace OperatingDec 6, 1994 |
- 3,650
- total depth, ft
- 3
- permits on file
- Dec 6, 1994
- last permit issued
- —
- completed
- 497
- cumulative oil, bbl
- 11
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1994 THROUGH Nov 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 1, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mallory O-9-13827 | Nordic (Jennings) | Pace Operating | 1 | 255 | 11 | Jun 1995 – Nov 1996 |
| Mallory O-9-13759 | Saxon (Serratt) | Pace Operating | 1 | 242 | 0 | Aug 1994 – Jul 1995 |
| Mallory O-9-13691 | Wildcat | Synergy Production Company | 1 | 0 | 0 | May 1994 – Apr 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Synergy Production CompanyAug 1994 → Dec 1994
- 2Pace OperatingJun 1995 → Feb 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 430550-98 | Recompletion | Pace Operating | Jul 12, 1995 | Dec 6, 1994 | May 4, 1995 | 3,650 |
| 430550-99 | Recompletion | Synergy Production Company | Dec 2, 1994 | Dec 6, 1994 | — | 3,650 |
| 423929-99 | Drill | Synergy Production Company | May 13, 1994 | May 13, 1994 | May 20, 1994 | 3,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-13691 | — | — | — | — |
| — | — O-9-13759 | — | — | — | — |
| — | — O-9-13827 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,842 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Serratt | 2,020 | -178 |
| Gunsight | 2,064 | -222 |
| Adams Branch | 2,820 | -978 |
| Jenning SD | 3,417 | -1,575 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,417 | 3,438 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 158 | 12.25 | 300 S |
| 4.5 | 3,647 | 7.875 | 1,090 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 24, 1995 | Jul 11, 1995 | Yes |
| 00 | Jul 31, 1995 | Mar 22, 1995 | — |
| 00 | Apr 21, 1995 | Mar 22, 1995 | — |
| 00 | Apr 10, 1995 | — | — |
| 00 | Nov 29, 1994 | Oct 7, 1994 | Yes |
| 00 | Oct 28, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-34316 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-34316 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39934316, documented in the API reference.