WELL · 42-399-34467 · DISTRICT 7

Bunyard 536 #5363

Plugged

Runnels County · Wildcat field  · Vertical

Bunyard 536 #5363 (API 42-399-34467) is a plugged well in Runnels County, plugged April 30, 1998, last operated by Geonatural Resources Inc..

The RRC has issued one drilling permit, issued August 5, 1996, permitted to 4,900 ft.

Completion filings report 4 formation tops, including T/Dog Bend, T/Capps, T/Goen, T/Gardner.

Operator of record

Geonatural Resources Inc.

Dallas, TX · P-5 Y, filed Sep 4, 2025 · 145 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGeonatural Resources Inc.
Production reportsnone
Latest permitGeonatural Resources, Inc.Aug 5, 1996
4,900
total depth, ft
1
permits on file
Aug 5, 1996
last permit issued
—
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1996 THROUGH Jun 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 30, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bunyard "536" O-9-14443WildcatGeonatural Resources, Inc.200Oct 1996 – Jun 1998

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
451123-99DrillGeonatural Resources, Inc.Aug 5, 1996Aug 5, 1996Aug 23, 19964,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-14443————

Formation tops

As filed on W-2/G-1. Subsea from 1,687 ft elevation.Download CSV →

FormationMD ftSubsea
T/Dog Bend3,210-1,523
T/Capps3,333-1,646
T/Goen3,508-1,821
T/Gardner3,680-1,993

Perforations

Perforated and open-hole intervals.

FromToType
3,6973,702Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520412.25140 S
4.53,8547.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 1997Apr 7, 1997Yes
00Jul 10, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39934467, documented in the API reference.