WELL · 42-399-34498 · DISTRICT 7

Andergram Unit #3

N

Runnels County · Andergram (Palo Pinto) field  · Vertical

Andergram Unit #3 (API 42-399-34498) is a well in Runnels County operated by Tkp Petroleum Inc., completed January 22, 1999.

The RRC has issued 2 drilling permits between 1996 and 1999, permitted to 4,900 ft.

Completion filings report 9 formation tops, including Serratt Sand, Serratt Sd, Mcmillan Sand, Mcmillan Sd.

Its 3 leases have reported 65.5K barrels of oil and 85.5K mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

TKP Petroleum Inc.

Lubbock, TX · P-5 Y, filed May 29, 2025 · 106 permits on file · (806) 543-0667

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTKP Petroleum Inc.
Production reportsMission Energy Inc.through Jan 2026
Latest permitTKP Petroleum, Inc.Nov 16, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
2
permits on file
Nov 16, 1999
last permit issued
Jan 22, 1999
completed
65.5K
cumulative oil, bbl
85.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 22, 1999
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Andergram Unit O-9-9496Andergram (Palo Pinto)TKP Petroleum, Inc.348.7K59.1KJan 1993 – Jul 2026
Andergram "A" O-9-20280Andergram (Palo Pinto)Mission Energy Inc.211.5K0Mar 2018 – Jul 2026
Eubanks O-9-14518Andergram (Jennings)TKP Petroleum, Inc.15.3K26.4KJan 1997 – Jun 2006

Oil, barrels lease total

Last 12 months 343 · prior 12 1,742(-80%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Watco Energy, Inc.Jan 1993 → Apr 1996
  2. 2Walsh Resources, Inc.May 1996 → Jul 1996
  3. 3TKP Petroleum, Inc.Aug 1996 → Jan 2018
  4. 4Mission Energy Inc.Jun 2019 → Jan 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489384-99RecompletionTKP Petroleum, Inc.Nov 10, 1999Nov 16, 1999Jan 22, 19993,500
456795-99DrillTKP Petroleum, Inc.Dec 27, 1996Dec 27, 1996Dec 27, 19964,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-9496————
—— O-9-14518————
—— O-9-20280————

Formation tops

As filed on W-2/G-1. Subsea from 1,727 ft elevation.Download CSV →

FormationMD ftSubsea
Serratt Sand2,450-723
Serratt SD2,450-723
McMillan Sand2,610-883
McMillan SD2,610-883
Palo PintoPALO PINTO LIME3,430-1,703
Palo PintoPALO PINTO LM3,430-1,703
Capps Lime3,650-1,923
Capps LM3,650-1,923
Jennings Sand3,912-2,185
Jennings SD3,912-2,185

Perforations

Perforated and open-hole intervals.

FromToType
3,4463,476Perforated
3,9123,913Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516412.25115 S
5.53,8937.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 2019Sep 23, 1999—
00May 22, 2000Sep 23, 1999—
00Apr 10, 2000——
00Mar 20, 1997Feb 5, 1997Yes
00Feb 25, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39934498, documented in the API reference.