WELL · 42-399-34896 · DISTRICT 7
Natalia #1
Runnels County · Norton N. (Jennings Sand) field · Vertical
Natalia #1 (API 42-399-34896) is a plugged well in Runnels County, plugged February 20, 2009, last operated by Enrich Oil Corporation.
The RRC has issued 3 drilling permits between 2005 and 2007, permitted to 5,000 ft.
Completion filings report 15 formation tops, including Upper Capps Lime, Upper Capps Lm, Upper Capps Lm., Goen Lm.
Its 3 leases have reported 6.42K barrels of oil and 7.11K mcf of gas since March 2006, last reporting in November 2012. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Abilene, TX · P-5 Y, filed Jan 4, 2026 · 529 permits on file · (325) 668-3812
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enrich Oil Corporation |
| Production reports | Enrich Oil Corporationthrough Oct 2008 |
| Latest permit | Enrich Oil CorporationApr 9, 2007 |
- 5,000
- total depth, ft
- 3
- permits on file
- Apr 9, 2007
- last permit issued
- May 14, 2006
- completed
- 6.42K
- cumulative oil, bbl
- 7.11K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Nov 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 14, 2006
- Shut in
- —
- Plugged
- Feb 20, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Natalia O-9-15953 | Norton, N. (Jennings Sand) | Enrich Oil Corporation | 1 | 0 | 0 | May 2006 – Nov 2012 |
| Natalia O-9-16205 | Norton, N. (Capps, Upper) | Enrich Oil Corporation | 1 | 5.87K | 5.49K | May 2006 – Aug 2009 |
| Natalia O-9-15909 | Norton, N. (Gardner Sand) | Enrich Oil Corporation | 2 | 551 | 1.63K | Mar 2006 – Mar 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enrich Oil CorporationMar 2006 → Oct 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 634670-99 | Recompletion | Enrich Oil Corporation | Mar 6, 2007 | Apr 9, 2007 | Feb 25, 2007 | 4,950 |
| 620319-99 | Recompletion | Enrich Oil Corporation | Jun 2, 2006 | Jun 2, 2006 | May 10, 2006 | 4,953 |
| 608049-99 | Drill | Enrich Oil Corporation | Oct 17, 2005 | Oct 21, 2005 | Nov 10, 2005 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-15909 | — | — | — | — |
| — | — O-9-15953 | — | — | — | — |
| — | — O-9-16205 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,863 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Upper Capps Lime | 4,178 | -2,315 |
| Upper Capps LM | 4,178 | -2,315 |
| Upper Capps Lm. | 4,178 | -2,315 |
| Goen LM | 4,360 | -2,497 |
| Goen Lm. | 4,360 | -2,497 |
| Jennings LM | 4,436 | -2,573 |
| Jennings Lm. | 4,436 | -2,573 |
| Jennings Sd. | 4,436 | -2,573 |
| Gardner LM | 4,550 | -2,687 |
| Gardner Lm. | 4,550 | -2,687 |
| Gardner Sd. | 4,550 | -2,687 |
| Gardner "a" SD | 4,624 | -2,761 |
| Gardner "a" Sd. | 4,624 | -2,761 |
| Odom LM | 4,778 | -2,915 |
| Odom Lm. | 4,778 | -2,915 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,178 | 4,185 | Perforated |
| 4,446 | 4,452 | Perforated |
| 4,556 | 4,660 | Perforated |
| 4,627 | 4,641 | Perforated |
| 4,644 | 4,650 | Perforated |
| 4,672 | 4,685 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 200 | 11 | 100 S |
| 5.5 | 2,158 | 7.875 | 110 S |
| 5.5 | 4,805 | 7.875 | 135 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 13, 2007 | Jul 6, 2007 | — |
| 00 | May 24, 2007 | Apr 26, 2007 | — |
| 00 | May 3, 2007 | — | — |
| 00 | Oct 9, 2006 | May 25, 2006 | Yes |
| 00 | Aug 10, 2006 | Mar 23, 2006 | Yes |
| 00 | Jun 15, 2006 | — | — |
| 00 | Apr 6, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-34896 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-34896 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39934896, documented in the API reference.