WELL · 42-399-34896 · DISTRICT 7

Natalia #1

Plugged

Runnels County · Norton N. (Jennings Sand) field  · Vertical

Natalia #1 (API 42-399-34896) is a plugged well in Runnels County, plugged February 20, 2009, last operated by Enrich Oil Corporation.

The RRC has issued 3 drilling permits between 2005 and 2007, permitted to 5,000 ft.

Completion filings report 15 formation tops, including Upper Capps Lime, Upper Capps Lm, Upper Capps Lm., Goen Lm.

Its 3 leases have reported 6.42K barrels of oil and 7.11K mcf of gas since March 2006, last reporting in November 2012. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Enrich Oil Corporation

Abilene, TX · P-5 Y, filed Jan 4, 2026 · 529 permits on file · (325) 668-3812

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEnrich Oil Corporation
Production reportsEnrich Oil Corporationthrough Oct 2008
Latest permitEnrich Oil CorporationApr 9, 2007
5,000
total depth, ft
3
permits on file
Apr 9, 2007
last permit issued
May 14, 2006
completed
6.42K
cumulative oil, bbl
7.11K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Nov 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 14, 2006
Shut in
—
Plugged
Feb 20, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Natalia O-9-15953Norton, N. (Jennings Sand)Enrich Oil Corporation100May 2006 – Nov 2012
Natalia O-9-16205Norton, N. (Capps, Upper)Enrich Oil Corporation15.87K5.49KMay 2006 – Aug 2009
Natalia O-9-15909Norton, N. (Gardner Sand)Enrich Oil Corporation25511.63KMar 2006 – Mar 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enrich Oil CorporationMar 2006 → Oct 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
634670-99RecompletionEnrich Oil CorporationMar 6, 2007Apr 9, 2007Feb 25, 20074,950
620319-99RecompletionEnrich Oil CorporationJun 2, 2006Jun 2, 2006May 10, 20064,953
608049-99DrillEnrich Oil CorporationOct 17, 2005Oct 21, 2005Nov 10, 20055,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-15909————
—— O-9-15953————
—— O-9-16205————

Formation tops

As filed on W-2/G-1. Subsea from 1,863 ft elevation.Download CSV →

FormationMD ftSubsea
Upper Capps Lime4,178-2,315
Upper Capps LM4,178-2,315
Upper Capps Lm.4,178-2,315
Goen LM4,360-2,497
Goen Lm.4,360-2,497
Jennings LM4,436-2,573
Jennings Lm.4,436-2,573
Jennings Sd.4,436-2,573
Gardner LM4,550-2,687
Gardner Lm.4,550-2,687
Gardner Sd.4,550-2,687
Gardner "a" SD4,624-2,761
Gardner "a" Sd.4,624-2,761
Odom LM4,778-2,915
Odom Lm.4,778-2,915

Perforations

Perforated and open-hole intervals.

FromToType
4,1784,185Perforated
4,4464,452Perforated
4,5564,660Perforated
4,6274,641Perforated
4,6444,650Perforated
4,6724,685Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62520011100 S
5.52,1587.875110 S
5.54,8057.875135 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 13, 2007Jul 6, 2007—
00May 24, 2007Apr 26, 2007—
00May 3, 2007——
00Oct 9, 2006May 25, 2006Yes
00Aug 10, 2006Mar 23, 2006Yes
00Jun 15, 2006——
00Apr 6, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39934896, documented in the API reference.