WELL · 42-399-34957 · DISTRICT 7

Pirtle #1

Plugged

Runnels County · Cree-Sykes (Gardner Upper) field  · Vertical

Pirtle #1 (API 42-399-34957) is a plugged well in Runnels County, plugged September 21, 2021, last operated by Willowbend Investments Inc..

The RRC has issued one drilling permit (amended once), issued May 22, 2006, permitted to 4,700 ft.

It was permitted by Byrne Oil Company and has since transferred to Willowbend Investments Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Palo Pinto, Jennings Sand, Upper Gardner.

Operator of record

Willowbend Investments Inc.

Permitted by Byrne Oil Company; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Jul 4, 2026 · 162 permits on file · (940) 781-2358

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWillowbend Investments Inc.
Production reportsWillowbend Investments, Inc.through May 2010
Latest permitByrne Oil CompanyMay 22, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,700
total depth, ft
2
permits on file
May 22, 2006
last permit issued
Feb 11, 2011
completed
0
cumulative oil, bbl
158K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Jun 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 11, 2011
Shut in
—
Plugged
Sep 21, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pirtle G-9-221853Cree-Sykes (Gardner, Upper)Willowbend Investments, Inc.10158KSep 2006 – Jun 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Byrne Oil CompanySep 2006 → Jan 2010
  2. 2Willowbend Investments, Inc.Feb 2010 → May 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619454-98DrillByrne Oil CompanyOct 6, 2006May 22, 2006—4,700
619454-99DrillByrne Oil CompanyMay 17, 2006May 22, 2006—4,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-221853————

Formation tops

As filed on W-2/G-1. Subsea from 1,915 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,251-1,336
Jennings Sand3,600-1,685
Upper Gardner3,861-1,946

Perforations

Perforated and open-hole intervals.

FromToType
3,6053,627Perforated
3,8613,866Perforated
3,8803,882Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529212.25175 S
4.53,9947.875215 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 12, 2011Feb 14, 2011—
00Mar 14, 2007Oct 10, 2006Yes
00Nov 21, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
48.7K
bbl, all reported
Mar 2022
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102473W-14 DisposalPlugged Jul 21, 20225001,5003,600–3,630

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120212022

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39934957, documented in the API reference.