WELL · 42-399-34991 · DISTRICT 7
Gary #2
Runnels County · Vertical
Gary #2 (API 42-399-34991) is a permitted well in Runnels County filed by Boaz Energy, LLC; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2006 and 2012, permitted to 5,000 ft.
Completion filings report 4 formation tops, including Palo Pinto, Morris Sand, Capps Lime, Jennings Sand.
Its lease has reported 7.65K barrels of oil and 19.5K mcf of gas since October 2006, last reporting in July 2026.
Operator of record
Midland, TX · P-5 Y, filed Apr 4, 2014 · 44 permits on file · (432) 528-9296
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Otex LLCthrough Apr 2021 |
| Latest permit | Boaz Energy, LLCMar 21, 2012 |
- 5,000
- total depth, ft
- 2
- permits on file
- Mar 21, 2012
- last permit issued
- —
- completed
- 7.65K
- cumulative oil, bbl
- 19.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gary O-9-16118 | Ballinger, West (Capps) | Simpson Operating Services, LP | 1 | 7.65K | 19.5K | Oct 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Panamerican Operating IncNov 2006 → Apr 2009
- 2Boaz Energy, LLCJun 2012 → Sep 2013
- 3Memorial Production Oper. LLCOct 2013 → Apr 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 734249-99 | Recompletion | Boaz Energy, LLC | Feb 20, 2012 | Mar 21, 2012 | — | 4,240 |
| 623876-99 | Drill | Panamerican Operating Inc | Aug 4, 2006 | Aug 4, 2006 | Sep 3, 2006 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-16118 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,689 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 3,380 | -1,691 |
| Palo PintoPALO PINTO LIME | 3,380 | -1,691 |
| Morris Sand | 3,560 | -1,871 |
| Capps Lime | 3,650 | -1,961 |
| Jennings Sand | 3,980 | -2,291 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,670 | 3,675 | Perforated |
| 3,670 | 3,682 | Perforated |
| 3,678 | 3,682 | Perforated |
| 3,710 | 3,716 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 182 | 12.25 | 135 S |
| 4.5 | 3,667 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 2013 | Jul 19, 2012 | — |
| 00 | May 4, 2007 | Jan 31, 2007 | Yes |
| 00 | Feb 20, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-399-34991 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-399-34991 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/39934991, documented in the API reference.