WELL · 42-399-35247 · DISTRICT 7

Linda #1

Y

Runnels County · Fennell (King Sand) field · Shut IN  · Vertical

Linda #1 (API 42-399-35247) is a well in Runnels County operated by Byrne Oil Company, completed April 25, 2011 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 23, 2011, permitted to 5,000 ft.

It was permitted by Sha-Jam Operating Corp. and has since transferred to Byrne Oil Company on the wellbore schedule.

Completion filings report one formation top, including B/Coleman Junction.

Its lease has reported 3.75K barrels of oil since April 2011, last reporting in July 2026.

Operator of record

Byrne Oil Company

Permitted by Sha-Jam Operating Corp.; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed Sep 4, 2025 · 42 permits on file · (254) 488-1053

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleByrne Oil Company
Production reports3-D Oil & Gasthrough Sep 2021
Latest permitSha-Jam Operating Corp.Feb 23, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,000
total depth, ft
2
permits on file
Feb 23, 2011
last permit issued
Apr 25, 2011
completed
3.75K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 25, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Linda O-9-17462Fennell (King Sand)Byrne Oil Company13.75K0Apr 2011 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sha-Jam Operating Corp.May 2011 → Nov 2011
  2. 23-D Oil & GasMar 2012 → Sep 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
710532-98DrillSha-Jam Operating Corp.Apr 12, 2011Feb 23, 2011Mar 28, 20113,100
710532-99DrillSha-Jam Operating Corp.Feb 17, 2011Feb 23, 2011Mar 28, 20115,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-17462————

Formation tops

As filed on W-2/G-1. Subsea from 1,935 ft elevation.Download CSV →

FormationMD ftSubsea
B/Coleman Junction1,90035

Perforations

Perforated and open-hole intervals.

FromToType
2,8482,854Perforated
2,8562,860Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522512.25135 S
5.53,0447.875385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 23, 2012May 31, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39935247, documented in the API reference.