WELL · 42-399-35302 · DISTRICT 7

Blackwell Green #4

Plugged

Runnels County · Winters SW. (Palo Pinto) field  · Vertical

Blackwell Green #4 (API 42-399-35302) is a plugged well in Runnels County, plugged May 17, 2016, last operated by Foree Oil Company.

The RRC has issued one drilling permit, issued October 19, 2011, permitted to 4,400 ft.

Completion filings report 2 formation tops, including Gardner Lime, Gray Sand.

Operator of record

Foree Oil Company

Terrell, TX · P-5 Y, filed Jul 4, 2026 · 42 permits on file · (214) 793-1809

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleForee Oil Company
Production reportsnone
Latest permitForee Oil CompanyOct 19, 2011
4,400
total depth, ft
1
permits on file
Oct 19, 2011
last permit issued
Dec 9, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2011 THROUGH Jul 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 9, 2011
Shut in
—
Plugged
May 17, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blackwell Green O-9-17855Winters, SW. (Palo Pinto)Foree Oil Company100Dec 2011 – Jul 2016

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
725827-99DrillForee Oil CompanyOct 6, 2011Oct 19, 2011Nov 29, 20114,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-17855————

Formation tops

As filed on W-2/G-1. Subsea from 1,781 ft elevation.Download CSV →

FormationMD ftSubsea
Gardner Lime4,250-2,469
Gray Sand4,350-2,569

Perforations

Perforated and open-hole intervals.

FromToType
3,6523,661Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62515611150 S
5.54,3387.875935 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 29, 2013May 17, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39935302, documented in the API reference.