WELL · 42-399-35342 · DISTRICT 7

Sapphire A #1

Y

Runnels County · Poe (Goen Sand) field · Injection  · Vertical

Sapphire A #1 (API 42-399-35342) is a well in Runnels County operated by Golden Oil And Ranch LLC, completed July 25, 2016 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued July 30, 2012, permitted to 6,000 ft.

It was permitted by Sha-Jam Operating Corp. and has since transferred to Golden Oil And Ranch LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Coleman Junction, King Sand, Capps.

Its lease has reported 16.5K barrels of oil and 40.8K mcf of gas since October 2012, last reporting in July 2026.

It holds an active disposal or injection permit, with 99K barrels injected in the 12 months reported through March 2025.

Operator of record

Golden Oil and Ranch LLC

Permitted by Sha-Jam Operating Corp.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Mar 4, 2026 · 38 permits on file · (432) 214-5521

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGolden Oil and Ranch LLC
Production reportsSha-Jam Operating Corp.through Oct 2014
Latest permitSha-Jam Operating Corp.Jul 30, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,000
total depth, ft
1
permits on file
Jul 30, 2012
last permit issued
Jul 25, 2016
completed
16.5K
cumulative oil, bbl
40.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 25, 2016
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sapphire 'A' O-9-18109Poe (Goen Sand)Golden Oil and Ranch, LLC116.5K40.8KOct 2012 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sha-Jam Operating Corp.Oct 2012 → Oct 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
744979-99DrillSha-Jam Operating Corp.Jul 19, 2012Jul 30, 2012Aug 27, 20126,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-18109————

Formation tops

As filed on W-2/G-1. Subsea from 1,956 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction1,816140
King Sand3,050-1,094
Capps4,244-2,288

Perforations

Perforated and open-hole intervals.

FromToType
4,4704,480Perforated
4,5094,515Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526012.25165 S
5.54,7867.875375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 19, 2016Aug 18, 2016—
00Nov 13, 2013Oct 5, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

99K
bbl, last 12 reported months
1.59M
bbl, all reported
Mar 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112878H-1 InjectionActive5,0002,0004,470–4,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 98,993 · prior 12 201,928(-51%)

020K40K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/39935342, documented in the API reference.