WELL · 42-401-30679 · DISTRICT 6

Kangerga B #1

Plugged

Rusk County · Minden (Travis Peak Cons.) field  · Vertical

Kangerga B #1 (API 42-401-30679) is a plugged well in Rusk County, plugged January 21, 2026, last operated by Tgnr Gulf Coast LLC.

The RRC has issued 2 drilling permits between 1978 and 1983, permitted to 8,000 ft.

It was permitted by Resources Prod. CO. Of Amer. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Pecan Gap, Good Land Lime, Massive Anhydrite (marker), Pettiet Lime.

Operator of record

TGNR Gulf Coast LLC

Permitted by Resources Prod. Co. of Amer.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsCci Gulf Coast Upstream LLCthrough Apr 2020
Latest permitResources Prod. Co. of Amer.Jun 24, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
2
permits on file
Jun 24, 1983
last permit issued
Jul 17, 1983
completed
0
cumulative oil, bbl
252K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 17, 1983
Shut in
—
Plugged
Jan 21, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kangerga "B" G-6-114190Rufus (Travis Peak)TGNR Gulf Coast LLC10252KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Concorde Exploration, Inc.Jan 1993 → Oct 1993
  2. 2Cex Operating CompanyNov 1993 → Nov 2002
  3. 3LKD Corp.Dec 2002 → Nov 2004
  4. 4Exco Resources, Inc.Dec 2004 → Mar 2007
  5. 5Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  6. 6Exco Operating Company, LPJul 2008 → May 2011
  7. 7Archon Resources LLCJun 2011 → Aug 2014
  8. 8Cci Gulf Coast Upstream LLCSep 2014 → Apr 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
199496-99OtherResources Prod. Co. of Amer.Jun 13, 1984Jun 24, 1983—7,707
19357-99DrillHinton Production CompanyMar 3, 1978Mar 3, 1978Mar 14, 19788,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-114190————

Formation tops

As filed on W-2/G-1. Subsea from 477 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan GapBASE PECAN GAP2,686-2,209
Good Land Lime4,101-3,624
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE6,271-5,794
Pettiet Lime6,976-6,499
Travis Peak7,301-6,824

Perforations

Perforated and open-hole intervals.

FromToType
7,1147,134Perforated
7,3067,612Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00511375 S
9.6251,05012.25610 S
5.57,7008.75510 S
5.57,70211375 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 11, 1985Dec 10, 1984—
00Jan 10, 1985Jul 17, 1983—
00Jan 12, 1984Aug 23, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40130679, documented in the API reference.