WELL · 42-401-30706 · DISTRICT 6
Todd J. Orville #1
Rusk County · Oak Hill (Travis Peak) field · Vertical
Todd J. Orville #1 (API 42-401-30706) is a plugged well in Rusk County, plugged August 13, 2004, last operated by Txu Gas Company.
The RRC has issued 2 drilling permits (amended once) between 1978 and 1989, permitted to 11,000 ft.
It was permitted by Arco Oil & Gas CO. and has since transferred to Txu Gas Company on the wellbore schedule.
Completion filings report 6 formation tops, including T. Glen Rose, T. Massive Anhy., T. Rodessa, T. Pettit.
Operator of record
Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jul 8, 2005 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Txu Gas Company |
| Production reports | none |
| Latest permit | Arco Oil & Gas Co.Mar 30, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,000
- total depth, ft
- 3
- permits on file
- Mar 30, 1989
- last permit issued
- Apr 16, 1989
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 16, 1989
- Shut in
- —
- Plugged
- Aug 13, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Todd, J. Orville G-6-131087 | Oak Hill (Travis Peak) | Txu Gas Company | 1 | 0 | 0 | Jan 1993 – Aug 2004 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 357573-98 | Recompletion | Arco Oil & Gas Co. | Jun 12, 1989 | Mar 30, 1989 | — | 10,635 |
| 357573-99 | Recompletion | Arco Oil & Gas Co. | Mar 30, 1989 | Mar 30, 1989 | — | 10,635 |
| 24240-99 | Drill | Henderson Clay Products, Inc. | May 15, 1978 | May 15, 1978 | May 20, 1978 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-131087 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 365 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T. Glen Rose | 4,518 | -4,153 |
| T. Massive Anhy. | 6,090 | -5,725 |
| T. Rodessa | 6,378 | -6,013 |
| T. Pettit | 7,072 | -6,707 |
| T. Travis Peak | 7,320 | -6,955 |
| T. Cotton Valley | 9,242 | -8,877 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,334 | 7,344 | Perforated |
| 10,352 | 10,590 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 3,248 | 12.25 | 1,150 S |
| 5.5 | 10,700 | 7.875 | 1,500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 10, 1989 | May 8, 1989 | Yes |
| 00 | Jul 5, 1989 | — | — |
| 00 | Jan 12, 1984 | Nov 20, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-30706 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-30706 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40130706, documented in the API reference.