WELL · 42-401-30810 · DISTRICT 6
Thompson Emma et AL #1
Rusk County · East Texas field · Vertical
Thompson Emma ET AL #1 (API 42-401-30810) is a plugged well in Rusk County, plugged May 31, 1988, last operated by Capital Oil & Gas Corporation.
The RRC has issued one drilling permit, issued March 20, 1979, permitted to 3,860 ft.
It was permitted by United Petroleum and has since transferred to Capital Oil & Gas Corporation on the wellbore schedule.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Woodbine.
Operator of record
Permitted by United Petroleum; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed Dec 13, 1985 · 4 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Capital Oil & Gas Corporation |
| Production reports | none |
| Latest permit | United PetroleumMar 20, 1979 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,860
- total depth, ft
- 1
- permits on file
- Mar 20, 1979
- last permit issued
- Apr 28, 1979
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 28, 1979
- Shut in
- —
- Plugged
- May 31, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 44743-99 | Drill | United Petroleum | Mar 20, 1979 | Mar 20, 1979 | — | 3,860 |
Formation tops
As filed on W-2/G-1. Subsea from 512 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 2,170 | -1,658 |
| Austin Chalk | 3,500 | -2,988 |
| Woodbine | 3,631 | -3,119 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,631 | 3,632 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 117 | 10.75 | 75 S |
| 4.5 | 3,830 | 7.875 | 160 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | May 29, 1979 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-30810 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-30810 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40130810, documented in the API reference.