WELL · 42-401-30904 · DISTRICT 6

Kelly Dan #15W

Y

Rusk County · East Texas field · Injection  · Vertical

Kelly Dan #15W (API 42-401-30904) is a well in Rusk County operated by Linder John Operating CO. LLC, completed August 20, 1980 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 31, 1979, permitted to 3,900 ft.

It was permitted by Mobil Oil Corporation and has since transferred to Linder John Operating CO. LLC on the wellbore schedule.

Its lease has reported 384K barrels of oil and 56.2K mcf of gas since January 1993, last reporting in July 2026. The lease carries 16 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 338K barrels injected in the 12 months reported through November 2025.

Operator of record

Linder John Operating Co. LLC

Permitted by Mobil Oil Corporation; the EWA schedule now lists a different operator.

Gladewater, TX · P-5 Y, filed Sep 4, 2025 · 14 permits on file · (903) 845-4240

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLinder John Operating Co. LLC
Production reportsLinder, John Operating Co., LLCthrough Apr 2026
Latest permitMobil Oil CorporationDec 31, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,900
total depth, ft
1
permits on file
Dec 31, 1979
last permit issued
Aug 20, 1980
completed
384K
cumulative oil, bbl
56.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 20, 1980
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kelly, Dan O-7-8144East TexasLinder, John Operating Co., LLC16384K56.2KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 7,034 · prior 12 6,037(+17%)

05001K202420252026

Gas, mcf lease total

Last 12 months 1,598 · prior 12 1,548(+3%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Jun 2005
  2. 2Linder, John Operating Co., LLCJul 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
68009-99DrillMobil Oil CorporationDec 31, 1979Dec 31, 1979May 21, 19803,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-7-8144————

Perforations

Perforated and open-hole intervals.

FromToType
3,6053,689Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,21014.75900 S
2.3753,577——
73,6109.875585 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Nov 11, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

338K
bbl, last 12 reported months
11.1M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000006442H-1 InjectionActive2,0001,0003,605–3,689

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 338,245 · prior 12 268,410(+26%)

010K20K30K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40130904, documented in the API reference.