WELL · 42-401-31159 · DISTRICT 6
Mayfield-Alford A #1-R
Rusk County · East Texas field · Shut IN · Vertical
Mayfield-Alford A #1-R (API 42-401-31159) is a well in Rusk County operated by Hartford Energy Inc., completed November 14, 1981 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued May 18, 1981, permitted to 3,700 ft.
It was permitted by Moss Petroleum CO. and has since transferred to Hartford Energy Inc. on the wellbore schedule.
Its lease has reported 779 barrels of oil and 20 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Moss Petroleum Co.; the EWA schedule now lists a different operator.
Wills Point, TX · P-5 Y, filed Jan 4, 2026 · 11 permits on file · (214) 864-4053
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hartford Energy Inc. |
| Production reports | Radar Satellite Solutions, Inc.through Jun 2013 |
| Latest permit | Moss Petroleum Co.May 18, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,700
- total depth, ft
- 1
- permits on file
- May 18, 1981
- last permit issued
- Nov 14, 1981
- completed
- 779
- cumulative oil, bbl
- 20
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 14, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mayfield-Alford 'A' O-7-8665 | East Texas | Hartford Energy, Inc. | 2 | 779 | 20 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Moss Petroleum CompanyJan 1993 → Jan 1996
- 2Lareau Energy Company, Inc.Jun 1996 → Dec 1996
- 3Maxima Energy Corp.Apr 1997 → Jul 1997
- 4Radar Satellite Solutions, Inc.Dec 2012 → Jun 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 119157-99 | Drill | Moss Petroleum Co. | May 18, 1981 | May 18, 1981 | — | 3,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-7-8665 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,589 | 3,593 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 165 | 12.5 | 100 S |
| 5.5 | 3,768 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Dec 28, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-31159 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-31159 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40131159, documented in the API reference.