WELL · 42-401-31523 · DISTRICT 6

Christian J. T. #1

N

Rusk County · Mary Jane (Dorsey Sand) field  · Vertical

Christian J. T. #1 (API 42-401-31523) is a well in Rusk County operated by Mustang Drilling Ltd., completed August 18, 1995.

The RRC has issued 3 drilling permits between 1982 and 2000, permitted to 11,950 ft.

It was permitted by Mustang Drilling, Inc. and has since transferred to Mustang Drilling Ltd. on the wellbore schedule.

Its 2 leases have reported 15.6K barrels of oil and 879K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Mustang Drilling Ltd.

Permitted by Mustang Drilling, Inc.; the EWA schedule now lists a different operator.

Henderson, TX · P-5 Y, filed Feb 6, 2009 · 32 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMustang Drilling Ltd.
Production reportsTGNR Gulf Coast LLCthrough Apr 2026
Latest permitMustang Drilling, Inc.Nov 27, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,950
total depth, ft
3
permits on file
Nov 27, 2000
last permit issued
Aug 18, 1995
completed
15.6K
cumulative oil, bbl
879K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 1995
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christian, J.T. No. 1 G.U. G-6-103638Oak Hill (Cotton Valley)TGNR Gulf Coast LLC10648KJan 1993 – Jul 2026
Christian, J. T. O-6-13472Mary Jane (Dorsey Sand)Mustang Drilling, Ltd.115.6K231KAug 1995 – Aug 2003

Gas, mcf lease total

Last 12 months 18,460 · prior 12 20,767(-11%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Drilling, Inc.Jan 1993 → May 2001
  2. 2Mustang Drilling, Ltd.Jun 2001 → Jul 2004
  3. 3Exco Resources, Inc.Aug 2004 → Mar 2007
  4. 4Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  5. 5Exco Operating Company, LPJul 2008 → May 2011
  6. 6Archon Resources LLCJun 2011 → Aug 2014
  7. 7Cci Gulf Coast Upstream LLCSep 2014 → Jan 2021
  8. 8TGNR Gulf Coast LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
502311-99RecompletionMustang Drilling, Inc.Nov 27, 2000Nov 27, 2000Dec 9, 200010,950
440925-99RecompletionMustang Drilling, Inc.Oct 24, 1995Oct 26, 1995—10,419
168748-99DrillTexaco Inc.Aug 9, 1982Aug 9, 1982—11,950

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-103638————
—— O-6-13472————

Perforations

Perforated and open-hole intervals.

FromToType
7,5027,508Perforated
10,68210,758Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,30012.251,315 S
5.510,9508.751,889 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 6, 2001Jan 18, 2001—
00Feb 8, 1996Oct 4, 1995Yes
00Dec 29, 1995——
00Jan 12, 1984Jan 25, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131523, documented in the API reference.