WELL · 42-401-31762 · DISTRICT 6
Rogers Estate Gas Unit #2
Rusk County · Vertical
Rogers Estate Gas Unit #2 (API 42-401-31762) is a permitted well in Rusk County filed by Henderson Clay Products, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits in 1983, permitted to 11,200 ft.
Completion filings report 10 formation tops, including Duck Creek Shale, Duck Creek Lime, Paluxy, Glen Rose.
Operator of record
Henderson, TX · P-5 Y, filed Mar 17, 1986 · 98 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | TGNR East Texas LLCthrough Sep 2022 |
| Latest permit | Henderson Clay Products, Inc.Oct 17, 1983 |
- 11,200
- total depth, ft
- 2
- permits on file
- Oct 17, 1983
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 828K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rogers Estate Gas Unit G-6-109187 | Oak Hill (Cotton Valley) | TGNR East Texas LLC | 1 | 0 | 828K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Castle Production CompanyJan 1993 → Apr 1997
- 2Union Pacific Resources CompanyMay 1997 → Jan 2001
- 3Rme Petroleum CompanyFeb 2001 → Nov 2002
- 4Anadarko E&P Company LPDec 2002 → Dec 2012
- 5Anadarko E&P Onshore LLCJan 2013 → Nov 2016
- 6Cci East Texas Upstream LLCDec 2016 → Mar 2019
- 7TGNR East Texas LLCFeb 2021 → Sep 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 217586-99 | Drill | Henderson Clay Products, Inc. | Oct 13, 1983 | Oct 17, 1983 | — | 11,200 |
| 216980-99 | Drill | Henderson Clay Products, Inc. | Sep 9, 1983 | Sep 9, 1983 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-109187 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 526 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Duck Creek Shale | 4,244 | -3,718 |
| Duck Creek Lime | 4,380 | -3,854 |
| Paluxy | 4,752 | -4,226 |
| Glen RoseUPPER GLEN ROSE | 5,042 | -4,516 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 6,430 | -5,904 |
| Pine Island | 7,260 | -6,734 |
| PettitPETTET | 7,376 | -6,850 |
| Travis Peak | 7,630 | -7,104 |
| Cotton Valley | 9,372 | -8,846 |
| BossierBOSSIER SHALE | 10,982 | -10,456 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,712 | 10,979 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,270 | 12.25 | 510 S |
| 4.5 | 11,050 | 7.875 | 2,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 22, 1984 | Feb 10, 1984 | — |
| 00 | Mar 9, 1984 | Feb 10, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-31762 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-31762 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40131762, documented in the API reference.