WELL · 42-401-31816 · DISTRICT 6
Pool #1
Rusk County · Penn-Griffith (Travis Peak Up.) field · Vertical
Pool #1 (API 42-401-31816) is a plugged well in Rusk County, plugged September 4, 2007, last operated by Capital Petroleum.
The RRC has issued 2 drilling permits between 1983 and 1994, permitted to 7,800 ft.
Completion filings report 6 formation tops, including Glen Rose, T/Massive Anhydrite, B/Massive Anhydrite, James Lime.
Operator of record
Henderson, TX · P-5 Y, filed Aug 4, 2025 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Capital Petroleum |
| Production reports | Capital Petroleumthrough Nov 1993 |
| Latest permit | Capital PetroleumMay 26, 1994 |
- 7,800
- total depth, ft
- 2
- permits on file
- May 26, 1994
- last permit issued
- Jan 10, 1984
- completed
- 0
- cumulative oil, bbl
- 1.24K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 10, 1984
- Shut in
- —
- Plugged
- Sep 4, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Pool G-6-109192 | Penn-Griffith (Travis Peak, Up.) | Capital Petroleum | 1 | 0 | 1.24K | Jan 1993 – Jul 2026 |
| Pool G-6-151806 | Martha Jane (Pettit, U.) | Capital Petroleum | 1 | 0 | 0 | Jun 1994 – Sep 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1McBrayer Oil CorporationJan 1993 → Jun 1993
- 2Capital PetroleumJul 1993 → Nov 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 424146-99 | Recompletion | Capital Petroleum | May 23, 1994 | May 26, 1994 | May 26, 1994 | 7,250 |
| 220422-99 | Drill | Marshall Expl. Inc. | Feb 23, 1984 | Nov 10, 1983 | — | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-109192 | — | — | — | — |
| — | — G-6-151806 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 449 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glen Rose | 5,466 | -5,017 |
| T/Massive Anhydrite | 6,140 | -5,691 |
| B/Massive Anhydrite | 6,285 | -5,836 |
| James LimeJAMES | 6,758 | -6,309 |
| Pettit | 7,003 | -6,554 |
| Travis Peak | 7,330 | -6,881 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,108 | 7,113 | Perforated |
| 7,138 | 7,143 | Perforated |
| 7,286 | 7,290 | Perforated |
| 7,302 | 7,307 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,108 | 12.25 | 600 S |
| 4.5 | 7,778 | 7.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 14, 1994 | Aug 10, 1994 | Yes |
| 00 | Dec 5, 1994 | — | — |
| 00 | Mar 20, 1984 | Jan 31, 1984 | — |
| 00 | Mar 9, 1984 | Jan 31, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-31816 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-31816 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40131816, documented in the API reference.