WELL · 42-401-31904 · DISTRICT 6

Clinton Will #1

Plugged

Rusk County · Toolan (Travis Peak) field  · Vertical

Clinton Will #1 (API 42-401-31904) is a plugged well in Rusk County, plugged July 31, 2014, last operated by Southwest Operating Inc.-Tyler.

The RRC has issued one drilling permit, issued June 14, 1984, permitted to 8,500 ft.

It was permitted by Tyler Workover, Inc. and has since transferred to Southwest Operating Inc.-Tyler on the wellbore schedule.

Completion filings report 6 formation tops, including Base Massive Anhyd., Bexar, Pine Island, Pettit.

Operator of record

Southwest Operating Inc.-Tyler

Permitted by Tyler Workover, Inc.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 63 permits on file · (903) 530-1563

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSouthwest Operating Inc.-Tyler
Production reportsnone
Latest permitTyler Workover, Inc.Jun 14, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Jun 14, 1984
last permit issued
Oct 15, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 15, 1984
Shut in
—
Plugged
Jul 31, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Clinton, Will G-6-116046Toolan (Travis Peak)Southwest Operating, Inc.-Tyler100Jan 1993 – Aug 2022

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
242114-99DrillTyler Workover, Inc.Jun 14, 1984Jun 14, 1984—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-116046————

Formation tops

As filed on W-2/G-1. Subsea from 377 ft elevation.Download CSV →

FormationMD ftSubsea
Base Massive Anhyd.6,048-5,671
Bexar6,394-6,017
Pine Island6,750-6,373
Pettit6,830-6,453
Transition Zone7,224-6,847
Travis Peak7,351-6,974

Perforations

Perforated and open-hole intervals.

FromToType
7,8277,831Perforated
7,9137,918Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,25012.25550 S
4.58,0057.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 1985Apr 9, 1985—
00May 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131904, documented in the API reference.