WELL · 42-401-31932 · DISTRICT 6

Ruh Frank #2

Plugged

Rusk County · Minden (Travis Peak Cons.) field  · Vertical

Ruh Frank #2 (API 42-401-31932) is a plugged well in Rusk County, plugged February 28, 2010, last operated by Anadarko E&P Company LP.

The RRC has issued one drilling permit, issued September 6, 1984, permitted to 8,000 ft.

It was permitted by Henderson Clay Products, Inc. and has since transferred to Anadarko E&P Company LP on the wellbore schedule.

Completion filings report 10 formation tops, including Duck Creek Shale, Duck Creek Lime, Paluxy, Glen Rose.

Its 2 leases have reported 18.9K barrels of oil and 31K mcf of gas since January 1993, last reporting in April 2010. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Company LP

Permitted by Henderson Clay Products, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Jul 4, 2025 · 2,635 permits on file · (832) 636-1111

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Company LP
Production reportsAnadarko E&P Company LPthrough Jul 2004
Latest permitHenderson Clay Products, Inc.Sep 6, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Sep 6, 1984
last permit issued
Nov 26, 1984
completed
18.9K
cumulative oil, bbl
31K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 26, 1984
Shut in
—
Plugged
Feb 28, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ruh, Frank O-6-14551Minden (Travis Peak Cons.)Anadarko E&P Company LP100Apr 2006 – Apr 2010
Ruh, Frank O-6-10095Cyril (Travis Peak 7650)Anadarko E&P Company LP218.9K31KJan 1993 – Nov 2006

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Castle Production CompanyJan 1993 → Apr 1997
  2. 2Union Pacific Resources CompanyMay 1997 → Feb 2000
  3. 3Rme Petroleum CompanyApr 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Jul 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
250436-99DrillHenderson Clay Products, Inc.Aug 15, 1984Sep 6, 1984—8,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-10095————
—— O-6-14551————

Formation tops

As filed on W-2/G-1. Subsea from 519 ft elevation.Download CSV →

FormationMD ftSubsea
Duck Creek Shale4,228-3,709
Duck Creek Lime4,364-3,845
Paluxy4,738-4,219
Glen RoseUPPER GLEN ROSE5,028-4,509
Massive Anhydrite (marker)MASSIVE ANHYDRITE6,428-5,909
Rodessa6,782-6,263
James LimeJAMES7,150-6,631
Pine Island7,260-6,741
PettitPETTET7,499-6,980
Travis Peak7,681-7,162

Perforations

Perforated and open-hole intervals.

FromToType
7,6577,670Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,19611362 S
4.57,8457.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 14, 2006Jan 11, 1985—
00Feb 14, 1985Jan 11, 1985—
00Feb 13, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131932, documented in the API reference.