WELL · 42-401-31940 · DISTRICT 6

Wylie Gas Unit #2

Y

Rusk County · Oak Hill (Cotton Valley) field · Producing  · Vertical

Wylie Gas Unit #2 (API 42-401-31940) is a well in Rusk County operated by Eqv Operating LLC, completed October 8, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 31, 1984, permitted to 10,965 ft.

It was permitted by American Petrofina CO. Of Tex. and has since transferred to Eqv Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Eqv Operating LLC

Permitted by American Petrofina Co. of Tex.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Aug 4, 2025 · (405) 831-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEqv Operating LLC
Production reportsEqv Operating LLCthrough Apr 2026
Latest permitAmerican Petrofina Co. of Tex.Aug 31, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,965
total depth, ft
1
permits on file
Aug 31, 1984
last permit issued
Oct 8, 1984
completed
0
cumulative oil, bbl
755K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 8, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wylie Gas Unit G-6-113445Oak Hill (Cotton Valley)Eqv Operating LLC10755KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 2,309 · prior 12 5,343(-57%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Sep 1993
  2. 2Seagull Mid-South, Inc.Oct 1993 → May 1998
  3. 3Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  4. 4Ocean Energy, Inc.Nov 2000 → Apr 2003
  5. 5EOG Resources, Inc.Apr 2007 → Aug 2010
  6. 6Tanos Exploration, LLCSep 2010 → Oct 2013
  7. 7Memorial Production Oper. LLCNov 2013 → May 2017
  8. 8Amplify Energy Operating LLCJun 2017 → Dec 2025
  9. 9Eqv Operating LLCJan 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
250321-99DrillAmerican Petrofina Co. of Tex.Nov 12, 1984Aug 31, 1984—10,965

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-113445————

Formation tops

As filed on W-2/G-1. Subsea from 458 ft elevation.Download CSV →

FormationMD ftSubsea
BMA6,512-6,054
Rodessa6,616-6,158
Pettit7,284-6,826
Travis Peak7,482-7,024
Sexton Sand10,548-10,090
BossierBOSSIER SHALE10,809-10,351

Perforations

Perforated and open-hole intervals.

FromToType
10,53010,800Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,20612.251,141 S
5.510,9657.8751,457 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 21, 1984Nov 8, 1984—
00Nov 20, 1984Oct 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40131940, documented in the API reference.