WELL · 42-401-32225 · DISTRICT 6

Pool W.B. Gas Unit #3

Y

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Pool W.B. Gas Unit #3 (API 42-401-32225) is a well in Rusk County operated by Tgnr East Texas LLC, completed December 12, 1988 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued September 16, 1988, permitted to 12,000 ft.

It was permitted by Arco Oil & Gas CO. and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Glen Rose, Rodessa, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Arco Oil & Gas Co.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 41 permits on file · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Apr 2025
Latest permitArco Oil & Gas Co.Sep 16, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Sep 16, 1988
last permit issued
Dec 12, 1988
completed
0
cumulative oil, bbl
488K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 12, 1988
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pool, W.B. Gas Unit G-6-129555Oak Hill (Cotton Valley)TGNR East Texas LLC10488KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,129(-100%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Castle Production CompanyJan 1993 → Apr 1997
  2. 2Union Pacific Resources CompanyMay 1997 → Jan 2001
  3. 3Rme Petroleum CompanyFeb 2001 → Nov 2002
  4. 4Anadarko E&P Company LPDec 2002 → Dec 2012
  5. 5Anadarko E&P Onshore LLCJan 2013 → Nov 2016
  6. 6Cci East Texas Upstream LLCDec 2016 → Jan 2021
  7. 7TGNR East Texas LLCFeb 2021 → Apr 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
351284-99DrillArco Oil & Gas Co.Sep 16, 1988Sep 16, 1988Oct 16, 198812,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-129555————

Formation tops

As filed on W-2/G-1. Subsea from 460 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose4,850-4,390
Rodessa6,495-6,035
PettitPETTIT LIME7,205-6,745
Travis Peak7,555-7,095
Cotton Valley9,230-8,770
BossierBOSSIER SHALE10,845-10,385

Perforations

Perforated and open-hole intervals.

FromToType
10,55510,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,65512.25704 S
5.511,0137.8751,411 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 10, 1989Dec 29, 1988Yes
00Jan 31, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40132225, documented in the API reference.