WELL · 42-401-32370 · DISTRICT 6
Burton R.J. #1
Rusk County · Jared (Travis Peak) field · Vertical
Burton R.J. #1 (API 42-401-32370) is a plugged well in Rusk County, plugged April 25, 2019, last operated by Conquest Energy Inc..
The RRC has issued 2 drilling permits between 1991 and 1994, permitted to 8,200 ft.
Completion filings report 4 formation tops, including Rodessa, James Lime, Pettit, Travis Peak.
Operator of record
Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 10 permits on file · (817) 763-9664
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Conquest Energy Inc. |
| Production reports | Conquest Energy, Inc.through Mar 2015 |
| Latest permit | Conquest Energy, Inc.Apr 6, 1994 |
- 8,200
- total depth, ft
- 2
- permits on file
- Apr 6, 1994
- last permit issued
- Mar 23, 1994
- completed
- 0
- cumulative oil, bbl
- 457K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 23, 1994
- Shut in
- —
- Plugged
- Apr 25, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Burton, R.J. G-6-150983 | Jared (Travis Peak) | Conquest Energy, Inc. | 1 | 0 | 378K | Mar 1994 – Jul 2026 |
| Burton, R. J. G-6-140733 | Jared (Rodessa) | Conquest Energy, Inc. | 1 | 0 | 79K | Jan 1993 – Apr 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Keith Petroleum CorporationJan 1993 → Jan 1993
- 2Rodessa Management, Inc.Feb 1993 → Dec 1993
- 3Conquest Energy, Inc.Jan 1994 → Mar 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 421961-99 | Recompletion | Conquest Energy, Inc. | Mar 11, 1994 | Apr 6, 1994 | Mar 21, 1994 | 8,200 |
| 393739-99 | Drill | Keith Petroleum Corporation | Nov 7, 1991 | Nov 15, 1991 | Nov 18, 1991 | 8,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-140733 | — | — | — | — |
| — | — G-6-150983 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 376 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 6,842 | -6,466 |
| James Lime | 7,310 | -6,934 |
| Pettit | 7,513 | -7,137 |
| Travis Peak | 7,760 | -7,384 |
| Travis Peak | 7,860 | -7,484 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,901 | 6,909 | Perforated |
| 7,782 | 7,792 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,088 | 11 | 330 S |
| 5.5 | 7,914 | 7.875 | 1,000 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 4, 1994 | Apr 18, 1994 | Yes |
| 00 | Sep 28, 1994 | — | — |
| 00 | Mar 13, 1992 | Feb 24, 1992 | Yes |
| 00 | Mar 6, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-32370 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-32370 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40132370, documented in the API reference.