WELL · 42-401-32374 · DISTRICT 6

Thompson Perry GU #5

Plugged

Rusk County · Oak Hill (Cotton Valley) field  · Vertical

Thompson Perry GU #5 (API 42-401-32374) is a plugged well in Rusk County, plugged June 17, 2021, last operated by Verado Energy Inc..

The RRC has issued one drilling permit (amended once), issued March 9, 1992, permitted to 10,600 ft.

Completion filings report 5 formation tops, including Rodessa, Pettit, Knowles Lime, Taylor.

Operator of record

Verado Energy Inc.

Allen, TX · P-5 Inactive, filed Jan 30, 2025 · 193 permits on file · (214) 368-5322

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleVerado Energy Inc.
Production reportsVerado Energy, Inc.through Jun 2021
Latest permitNuevo Energy CompanyMar 9, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,600
total depth, ft
2
permits on file
Mar 9, 1992
last permit issued
Mar 21, 1994
completed
0
cumulative oil, bbl
1.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH Jun 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 21, 1994
Shut in
—
Plugged
Jun 17, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thompson, Perry GU G-6-149618Oak Hill (Cotton Valley)Verado Energy, Inc.101.6MMar 1994 – Jun 2021

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Verado Energy, Inc.Mar 1994 → Jun 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
396175-98DrillVerado Energy, Inc.Oct 11, 1993Mar 9, 1992Dec 29, 199310,500
396175-99DrillNuevo Energy CompanyJan 27, 1992Mar 9, 1992—10,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-149618————

Formation tops

As filed on W-2/G-1. Subsea from 368 ft elevation.Download CSV →

FormationMD ftSubsea
Rodessa6,197-5,829
Pettit6,852-6,484
Knowles Lime10,083-9,715
TaylorFIRST TAYLOR SAND10,155-9,787
TaylorBASE TAYLOR SAND10,450-10,082
BossierBOSSIER SHALE10,460-10,092

Perforations

Perforated and open-hole intervals.

FromToType
9,0909,124Perforated
9,1349,141Perforated
9,1549,174Perforated
9,2089,234Perforated
9,3439,344Perforated
9,3769,399Perforated
9,4869,492Perforated
9,5199,524Perforated
9,5249,532Perforated
9,5349,540Perforated
9,5439,551Perforated
9,5529,560Perforated
9,5649,576Perforated
9,5989,602Perforated
9,7029,706Perforated
9,7929,796Perforated
9,8479,852Perforated
9,8649,875Perforated
9,8779,903Perforated
9,9069,916Perforated
9,9469,951Perforated
9,9909,997Perforated
10,15510,159Perforated
10,16410,166Perforated
10,17010,172Perforated
10,21010,239Perforated
10,29410,301Perforated
10,31010,312Perforated
10,31510,320Perforated
10,36510,371Perforated
10,41410,417Perforated
10,42010,424Perforated
10,43810,450Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,52712.25490 S
5.510,6178.751,450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 18, 1994Apr 18, 1994Yes
00Jun 24, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40132374, documented in the API reference.