WELL · 42-401-32637 · DISTRICT 6
Smith Carrie #1
Rusk County · Shiloh (Travis Peak) field · Vertical
Smith Carrie #1 (API 42-401-32637) is a well in Rusk County operated by Merit Energy Company, completed August 1, 1996.
The RRC has issued 2 drilling permits between 1996 and 1999, permitted to 8,500 ft.
Completion filings report 3 formation tops, including BMA, Pettit, Travis Peak.
No lease production has been reported under this well’s leases.
It holds an active disposal or injection permit, with 795K barrels injected in the 12 months reported through November 2025.
Operator of record
Dallas, TX · P-5 Y, filed Sep 4, 2025 · 1,049 permits on file · (972) 628-1559
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Merit Energy Company |
| Production reports | Enervest Operating, L.L.C.through Jan 2006 |
| Latest permit | Merit Energy CompanyMay 11, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 2
- permits on file
- May 11, 1999
- last permit issued
- Aug 1, 1996
- completed
- 0
- cumulative oil, bbl
- 99.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 1, 1996
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smith, Carrie G-6-176617 | Shiloh(travis Peak -A-) | Diversified Production LLC | 1 | 0 | 261 | Jun 1999 – Jul 2026 |
| Smith, Carrie G-6-160486 | Shiloh (Travis Peak) | Merit Energy Company | 1 | 0 | 99.5K | Aug 1996 – Jun 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1GMT Inc.Sep 1996 → Jun 1998
- 2Enervest Operating, L.L.C.Oct 2005 → Jan 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 484449-99 | Recompletion | Merit Energy Company | May 11, 1999 | May 11, 1999 | May 11, 1999 | 8,500 |
| 448188-99 | Drill | GMT Inc. | May 16, 1996 | May 16, 1996 | May 27, 1996 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-160486 | — | — | — | — |
| — | — G-6-176617 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 459 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 6,180 | -5,721 |
| Pettit | 6,906 | -6,447 |
| PettitPETTIT- TOP | 6,906 | -6,447 |
| Travis Peak | 7,250 | -6,791 |
| Travis PeakTRAVIS PEAK -TOP | 7,250 | -6,791 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,542 | 3,562 | Perforated |
| 3,624 | 3,664 | Perforated |
| 3,798 | 3,828 | Perforated |
| 3,847 | 3,857 | Perforated |
| 8,170 | 8,182 | Perforated |
| 8,222 | 8,235 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,300 | 11 | 335 S |
| 8.625 | 1,300 | 12.25 | 345 S |
| 5.5 | 8,202 | 7.875 | 845 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 22, 2011 | Nov 3, 2010 | — |
| 00 | Apr 5, 2010 | Feb 1, 2010 | — |
| 00 | May 11, 2000 | Mar 6, 2000 | Yes |
| 00 | May 3, 2000 | — | — |
| 00 | Dec 6, 1996 | Oct 30, 1996 | Yes |
| 00 | Nov 13, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-32637 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-32637 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 795K
- bbl, last 12 reported months
- 11.9M
- bbl, all reported
- Nov 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000097096 | W-14 Disposal | Active | 10,000 | 1,750 | 3,500–4,000 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 795,430 · prior 12 691,256(+15%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40132637, documented in the API reference.