WELL · 42-401-32718 · DISTRICT 6

Beck Fred Gas Unit #5

Y

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Beck Fred Gas Unit #5 (API 42-401-32718) is a well in Rusk County operated by Tgnr East Texas LLC, completed December 23, 2000 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued May 20, 1997, permitted to 11,500 ft.

It was permitted by Castle Production Company and has since transferred to Tgnr East Texas LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Mass Anhy, Mass Anhy., Mass Anyhdrite, Rodessa.

No lease production has been reported under this well’s leases.

Operator of record

TGNR East Texas LLC

Permitted by Castle Production Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · 41 permits on file · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR East Texas LLC
Production reportsTGNR East Texas LLCthrough Jun 2023
Latest permitCastle Production CompanyMay 20, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
1
permits on file
May 20, 1997
last permit issued
Dec 23, 2000
completed
0
cumulative oil, bbl
128K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 23, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Beck, Fred Gas Unit G-6-167272Oak Hill (Cotton Valley)TGNR East Texas LLC10128KOct 1997 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Pacific Resources CompanyOct 1997 → Jan 2001
  2. 2Rme Petroleum CompanyFeb 2001 → Nov 2002
  3. 3Anadarko E&P Company LPDec 2002 → Jan 2007
  4. 4Anadarko E&P Onshore LLCSep 2015 → Oct 2016
  5. 5Cci East Texas Upstream LLCJan 2017 → Jan 2021
  6. 6TGNR East Texas LLCFeb 2021 → Jun 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
462665-99DrillCastle Production CompanyMay 20, 1997May 20, 1997Jul 27, 199711,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-167272————

Formation tops

As filed on W-2/G-1. Subsea from 443 ft elevation.Download CSV →

FormationMD ftSubsea
Mass Anhy6,234-5,791
Mass Anhy.6,234-5,791
Mass Anyhdrite6,234-5,791
Rodessa6,600-6,157
James LimeJAMES6,940-6,497
Pettit7,130-6,687
Travis Peak7,468-7,025
Cotton Valley9,100-8,657

Perforations

Perforated and open-hole intervals.

FromToType
9,4809,490Perforated
9,5989,608Perforated
9,9089,916Perforated
9,9289,936Perforated
10,00010,010Perforated
10,08010,094Perforated
10,21810,230Perforated
10,24010,224Perforated
10,48010,490Perforated
10,55810,568Perforated
10,58710,597Perforated
10,60810,618Perforated
10,67210,682Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,63011350 S
4.510,9637.8751,685 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 2, 2001Oct 3, 2001—
00Aug 17, 1999Jul 21, 1999—
00Apr 15, 1998Feb 17, 1998Yes
00Apr 2, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40132718, documented in the API reference.