WELL · 42-401-33045 · DISTRICT 6
Wallace #1
Rusk County · Beckville (Cotton Valley) field · Temp Abandoned · Vertical
Wallace #1 (API 42-401-33045) is a well in Rusk County operated by Valence Operating Company, completed October 27, 2001 and listed as temp abandoned on the RRC schedule.
The RRC has issued 2 drilling permits between 2000 and 2009, permitted to 10,700 ft.
Completion filings report 4 formation tops, including Rodessa, Pettit, Travis Peak, Base B Lime.
No lease production has been reported under this well’s leases.
Operator of record
Kingwood, TX · P-5 Y, filed Apr 4, 2026 · 990 permits on file · (281) 359-3659
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Valence Operating Company |
| Production reports | Valence Operating Companythrough Jan 2023 |
| Latest permit | Valence Operating CompanyJun 18, 2009 |
- 10,700
- total depth, ft
- 2
- permits on file
- Jun 18, 2009
- last permit issued
- Oct 27, 2001
- completed
- 0
- cumulative oil, bbl
- 887K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 27, 2001
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wallace G-6-185828 | Oak Hill, S.(cotton Valley) | Valence Operating Company | 1 | 0 | 887K | Oct 2001 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Reserve Management, Inc.Oct 2001 → Jan 2008
- 2Valence Operating CompanyFeb 2008 → Jan 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 681983-99 | Field transfer | Valence Operating Company | Jun 9, 2009 | Jun 18, 2009 | Mar 6, 2001 | 10,570 |
| 501215-99 | Drill | Reserve Management, Inc. | Oct 25, 2000 | Oct 25, 2000 | Mar 6, 2001 | 10,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-185828 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 345 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rodessa | 6,030 | -5,685 |
| Pettit | 6,696 | -6,351 |
| Travis Peak | 6,994 | -6,649 |
| Base B Lime | 9,064 | -8,719 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,226 | 10,462 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,200 | 12.25 | 605 S |
| 4.5 | 10,570 | 7.875 | 1,171 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 31, 2009 | Jun 3, 2009 | — |
| 00 | Dec 13, 2001 | Nov 15, 2001 | Yes |
| 00 | Dec 7, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-33045 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-33045 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40133045, documented in the API reference.