WELL · 42-401-33069 · DISTRICT 6

Jackson Fred B. #2

Y

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Jackson Fred B. #2 (API 42-401-33069) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed March 16, 2001 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued January 4, 2001, permitted to 12,000 ft.

It was permitted by Mustang Drilling, Inc. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Bma Rodessa, Bexar Shale, James Lime, Pine Island Shale.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Gulf Coast LLC

Permitted by Mustang Drilling, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsTGNR Gulf Coast LLCthrough Aug 2021
Latest permitMustang Drilling, Inc.Jan 4, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Jan 4, 2001
last permit issued
Mar 16, 2001
completed
0
cumulative oil, bbl
810K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 16, 2001
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson, Fred B. G-6-181903Oak Hill (Cotton Valley)TGNR Gulf Coast LLC10810KMar 2001 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mustang Drilling, Inc.Mar 2001 → May 2001
  2. 2Mustang Drilling, Ltd.Jun 2001 → Jul 2004
  3. 3Exco Resources, Inc.Aug 2004 → Mar 2007
  4. 4Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  5. 5Exco Operating Company, LPJul 2008 → May 2011
  6. 6Archon Resources LLCJun 2011 → Aug 2014
  7. 7Cci Gulf Coast Upstream LLCSep 2014 → Apr 2019
  8. 8TGNR Gulf Coast LLCAug 2021 → Aug 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
503649-99DrillMustang Drilling, Inc.Jan 4, 2001Jan 4, 2001Jan 24, 200112,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-181903————

Formation tops

As filed on W-2/G-1. Subsea from 495 ft elevation.Download CSV →

FormationMD ftSubsea
Bma Rodessa6,110-5,615
Bexar Shale6,511-6,016
James Lime6,563-6,068
Pine Island Shale6,717-6,222
Pettit6,797-6,302
Travis Peak7,551-7,056

Perforations

Perforated and open-hole intervals.

FromToType
10,68110,928Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,62011395 S
4.511,0227.8752,410 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 12, 2001Apr 5, 2001Yes
00Apr 25, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133069, documented in the API reference.