WELL · 42-401-33335 · DISTRICT 6
Crim #2
Rusk County · Vertical
Crim #2 (API 42-401-33335) is a permitted well in Rusk County filed by El Paso Production Company; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2004 and 2006, permitted to 11,200 ft.
Completion filings report 4 formation tops, including BMA, Sligo, Travis Peak, Base Cv "B Lime".
Operator of record
Houston, TX · P-5 Y, filed Jul 7, 2006 · 248 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Sabine Energy Inc.through Mar 2026 |
| Latest permit | EL Paso Production CompanyMay 24, 2006 |
- 11,200
- total depth, ft
- 2
- permits on file
- May 24, 2006
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 890K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2004 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crim G-6-204906 | Minden (Cotton Valley Cons.) | Sabine Energy Inc. | 1 | 0 | 890K | Jul 2004 – Jul 2026 |
Gas, mcf lease total
Last 12 months 8 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1GMT Energy Corp.Jul 2004 → Feb 2005
- 2EL Paso Production CompanyMar 2005 → Jul 2006
- 3EL Paso E & P Company, L. P.Aug 2006 → Oct 2011
- 4NFR Energy, LLCNov 2011 → Jan 2013
- 5Sabine Oil & Gas LLCFeb 2013 → Mar 2015
- 6Sabine Oil & Gas CorporationApr 2015 → Jul 2019
- 7Sabine Energy Inc.Mar 2026 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 619806-99 | Recompletion | EL Paso Production Company | May 24, 2006 | May 24, 2006 | — | 10,750 |
| 543652-99 | Drill | GMT Energy Corp. | Mar 24, 2004 | Mar 29, 2004 | Jun 17, 2004 | 11,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-204906 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 454 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 6,266 | -5,812 |
| SligoTOP SLIGO | 7,036 | -6,582 |
| Travis PeakTOP TRAVIS PEAK | 7,354 | -6,900 |
| Base CV "B Lime" | 9,386 | -8,932 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,422 | 9,574 | Perforated |
| 9,692 | 9,850 | Perforated |
| 10,156 | 10,298 | Perforated |
| 10,474 | 10,622 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,215 | 11 | 334 S |
| 4.5 | 10,750 | 7.875 | 1,285 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 9, 2005 | Oct 7, 2004 | Yes |
| 00 | Dec 30, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-33335 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-33335 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40133335, documented in the API reference.