WELL · 42-401-33366 · DISTRICT 6

Maxwell J.P. Est. #1

Y

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Maxwell J.P. Est. #1 (API 42-401-33366) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed December 9, 2005 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued June 14, 2004, permitted to 11,300 ft.

It was permitted by Exco Resources, Inc. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Bac, Buda, BMA, Rodessa.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Gulf Coast LLC

Permitted by Exco Resources, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsTGNR Gulf Coast LLCthrough Dec 2025
Latest permitExco Resources, Inc.Jun 14, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,300
total depth, ft
3
permits on file
Jun 14, 2004
last permit issued
Dec 9, 2005
completed
0
cumulative oil, bbl
496K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 9, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Maxwell, J.P. Est. G-6-217295Oak Hill (Cotton Valley)TGNR Gulf Coast LLC10496KDec 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 1,255 · prior 12 1,890(-34%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Resources, Inc.Dec 2005 → Mar 2007
  2. 2Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  3. 3Exco Operating Company, LPJul 2008 → May 2011
  4. 4Archon Resources LLCJun 2011 → Aug 2014
  5. 5Cci Gulf Coast Upstream LLCSep 2014 → Jan 2021
  6. 6TGNR Gulf Coast LLCFeb 2021 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
546789-97DrillExco Resources, Inc.Dec 22, 2005Jun 14, 2004—11,300
546789-98DrillExco Resources, Inc.Aug 1, 2005Jun 14, 2004—11,300
546789-99DrillCotton Valley Operations, Inc.Jun 10, 2004Jun 14, 2004—11,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-217295————

Formation tops

As filed on W-2/G-1. Subsea from 490 ft elevation.Download CSV →

FormationMD ftSubsea
Bac3,650-3,160
Buda3,700-3,210
BMA6,835-6,345
Rodessa6,880-6,390
James LimeJAMES7,297-6,807
Pettit7,532-7,042
Travis Peak7,804-7,314
CV B Lime9,650-9,160
CV C Lime10,790-10,300
CV Taylor10,870-10,380
Bossier11,110-10,620

Perforations

Perforated and open-hole intervals.

FromToType
10,87311,087Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.7546814.75406 S
8.6251,30111510 S
4.511,1877.8752,445 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 2006Jan 20, 2006Yes
00Jul 25, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133366, documented in the API reference.