WELL · 42-401-33397 · DISTRICT 6
Allen David #4
Rusk County · Minden (Cotton Valley Cons.) field · Vertical
Allen David #4 (API 42-401-33397) is a plugged well in Rusk County, plugged February 14, 2025, last operated by Sabine Oil & Gas Corporation.
The RRC has issued one drilling permit, issued August 27, 2004, permitted to 11,200 ft.
It was permitted by Gmt Energy Corp. and has since transferred to Sabine Oil & Gas Corporation on the wellbore schedule.
Completion filings report 4 formation tops, including BMA, Sligo, Travis Peak, Base Cv "B Lime".
Operator of record
Permitted by GMT Energy Corp.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Dec 4, 2025 · 466 permits on file · (866) 520-0402
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sabine Oil & Gas Corporation |
| Production reports | Sabine Oil & Gas Corporationthrough Feb 2025 |
| Latest permit | GMT Energy Corp.Aug 27, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,200
- total depth, ft
- 1
- permits on file
- Aug 27, 2004
- last permit issued
- Dec 31, 2004
- completed
- 0
- cumulative oil, bbl
- 893K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2004 THROUGH Feb 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 31, 2004
- Shut in
- —
- Plugged
- Feb 14, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Allen, David G-6-208479 | Minden (Cotton Valley Cons.) | Sabine Oil & Gas Corporation | 1 | 0 | 893K | Dec 2004 – Feb 2025 |
Gas, mcf lease total
Last 12 months 0 · prior 12 2,422(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EL Paso Production CompanyDec 2004 → Jul 2006
- 2EL Paso E & P Company, L. P.Aug 2006 → Oct 2011
- 3NFR Energy, LLCNov 2011 → Jan 2013
- 4Sabine Oil & Gas LLCFeb 2013 → Mar 2015
- 5Sabine Oil & Gas CorporationApr 2015 → Feb 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 550006-99 | Drill | GMT Energy Corp. | Aug 23, 2004 | Aug 27, 2004 | Nov 20, 2004 | 11,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-208479 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 527 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 6,343 | -5,816 |
| SligoTOP SLIGO | 7,070 | -6,543 |
| Travis PeakTOP TRAVIS PEAK | 7,396 | -6,869 |
| Base CV "B Lime" | 9,460 | -8,933 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,467 | 9,618 | Perforated |
| 9,792 | 10,008 | Perforated |
| 10,175 | 10,363 | Perforated |
| 10,448 | 10,648 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,200 | 11 | 384 S |
| 4.5 | 10,750 | 7.875 | 1,380 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 12, 2005 | Mar 21, 2005 | Yes |
| 00 | Jun 3, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-33397 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-33397 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40133397, documented in the API reference.