WELL · 42-401-33480 · DISTRICT 6

Bolt Doris-Boyd C.D. #4

Y

Rusk County · Oak Hill (Cotton Valley) field · Temp Abandoned  · Vertical

Bolt Doris-Boyd C.D. #4 (API 42-401-33480) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed April 4, 2005 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued February 11, 2005, permitted to 12,000 ft.

It was permitted by Exco Resources, Inc. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 8 formation tops, including BMA, Rodessa, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Gulf Coast LLC

Permitted by Exco Resources, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsCci Gulf Coast Upstream LLCthrough Jan 2021
Latest permitExco Resources, Inc.Feb 11, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Feb 11, 2005
last permit issued
Apr 4, 2005
completed
0
cumulative oil, bbl
441K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 4, 2005
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bolt, Doris-Boyd, C.D. G-6-212335Oak Hill (Cotton Valley)TGNR Gulf Coast LLC10441KApr 2005 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Resources, Inc.Apr 2005 → Mar 2007
  2. 2Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  3. 3Exco Operating Company, LPJul 2008 → May 2011
  4. 4Archon Resources LLCJun 2011 → Aug 2014
  5. 5Cci Gulf Coast Upstream LLCSep 2014 → Jan 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
556217-99DrillExco Resources, Inc.Jan 14, 2005Feb 11, 2005Feb 17, 200512,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-212335————

Formation tops

As filed on W-2/G-1. Subsea from 356 ft elevation.Download CSV →

FormationMD ftSubsea
BMA6,467-6,111
Rodessa6,540-6,184
James Lime6,902-6,546
Pettit7,150-6,794
Travis Peak7,420-7,064
CV Sands9,450-9,094
CV Taylor10,384-10,028
Bossier10,695-10,339

Perforations

Perforated and open-hole intervals.

FromToType
10,39610,399Perforated
10,43010,433Perforated
10,45410,458Perforated
10,48610,489Perforated
10,52810,534Perforated
10,55610,559Perforated
10,58210,585Perforated
10,59910,602Perforated
10,63610,639Perforated
10,65610,659Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,09611320 S
4.510,8007.8751,260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 27, 2006Jul 8, 2005Yes
00Nov 29, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133480, documented in the API reference.