WELL · 42-401-33772 · DISTRICT 6

Craig Don S. GU 1 #2

Y

Rusk County · Minden (Cotton Valley Cons.) field · Temp Abandoned  · Vertical

Craig Don S. GU 1 #2 (API 42-401-33772) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed February 12, 2006 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued December 22, 2005, permitted to 11,000 ft.

It was permitted by Exco Resources, Inc. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 9 formation tops, including Bac, BMA, Rodessa, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Gulf Coast LLC

Permitted by Exco Resources, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsTGNR Gulf Coast LLCthrough May 2021
Latest permitExco Resources, Inc.Dec 22, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Dec 22, 2005
last permit issued
Feb 12, 2006
completed
0
cumulative oil, bbl
406K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 12, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Craig, Don S. GU 1 G-6-219766Minden (Cotton Valley Cons.)TGNR Gulf Coast LLC10406KFeb 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Resources, Inc.Feb 2006 → Mar 2007
  2. 2Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  3. 3Exco Operating Company, LPJul 2008 → May 2011
  4. 4Archon Resources LLCJun 2011 → Aug 2014
  5. 5Cci Gulf Coast Upstream LLCSep 2014 → Apr 2020
  6. 6TGNR Gulf Coast LLCMay 2021 → May 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
611472-99DrillExco Resources, Inc.Dec 22, 2005Dec 22, 2005Jan 6, 200611,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-219766————

Formation tops

As filed on W-2/G-1. Subsea from 442 ft elevation.Download CSV →

FormationMD ftSubsea
Bac3,253-2,811
BMA6,292-5,850
Rodessa6,330-5,888
James Lime6,783-6,341
PettitPETTET7,000-6,558
Travis Peak7,278-6,836
Base CV "B" Lime9,346-8,904
Cotton ValleyCOTTON VALLEY TAYLOR10,420-9,978
BossierBOSSIER SHALE10,640-10,198

Perforations

Perforated and open-hole intervals.

FromToType
10,01710,228Perforated
10,44110,620Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
167720—
8.6251,17511400 S
4.510,7307.8751,325 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 2007Apr 20, 2006Yes
00Oct 4, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40133772, documented in the API reference.