WELL · 42-401-33985 · DISTRICT 6

Rainbolt #1

Y

Rusk County · Naconiche Creek (Rod.-TP Cons.) field · Injection  · Vertical

Rainbolt #1 (API 42-401-33985) is a well in Rusk County operated by Barrow-Shaver Resources CO., completed September 23, 2006 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued July 3, 2006, permitted to 9,600 ft.

It was permitted by Gmt Exploration CO Texas, LLC and has since transferred to Barrow-Shaver Resources CO. on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, Bexar Mkr, James Lime, Pine Island.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 9.47K barrels injected in the 12 months reported through November 2025.

Operator of record

Barrow-Shaver Resources Co.

Permitted by GMT Exploration Co Texas, LLC; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarrow-Shaver Resources Co.
Production reportsnone
Latest permitGMT Exploration Co Texas, LLCJul 3, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,600
total depth, ft
1
permits on file
Jul 3, 2006
last permit issued
Sep 23, 2006
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 23, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rainbolt G-6-225336Naconiche Creek (Rod.-TP Cons.)Barrow-Shaver Resources Co.100Nov 2006 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
621996-99DrillGMT Exploration Co Texas, LLCJul 3, 2006Jul 3, 2006Sep 1, 20069,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-225336————

Formation tops

As filed on W-2/G-1. Subsea from 523 ft elevation.Download CSV →

FormationMD ftSubsea
BMA6,189-5,666
Bexar MKR6,536-6,013
James LimeJAMES6,685-6,162
Pine Island6,863-6,340
Sligo6,927-6,404
Travis Peak7,348-6,825

Perforations

Perforated and open-hole intervals.

FromToType
6,2326,237Perforated
6,234639Perforated
6,2346,340Perforated
6,3056,340Perforated
7,4019,136Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,34511440 S
5.59,3277.875666 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 25, 2025Jan 7, 2025—
00Nov 18, 2008Mar 3, 2008—
00May 9, 2007Feb 26, 2007Yes
00Mar 15, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

9.47K
bbl, last 12 reported months
2.32M
bbl, all reported
Nov 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000098272W-14 DisposalActive4,0003,0006,234–6,340

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 9,473 · prior 12 24,685(-62%)

02K4K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.