WELL · 42-401-34016 · DISTRICT 6
Garrison #2
Rusk County · Naconiche Creek (Rod.-TP Cons.) field · Vertical
Garrison #2 (API 42-401-34016) is a plugged well in Rusk County, plugged March 6, 2025, last operated by Barrow-Shaver Resources CO..
The RRC has issued one drilling permit, issued July 27, 2006, permitted to 9,600 ft.
It was permitted by Gmt Exploration CO Texas, LLC and has since transferred to Barrow-Shaver Resources CO. on the wellbore schedule.
Completion filings report 6 formation tops, including BMA, Bexar Mkr, James Lime, Sligo.
Operator of record
Permitted by GMT Exploration Co Texas, LLC; the EWA schedule now lists a different operator.
Tyler, TX · P-5 X, filed Apr 2, 2026 · 201 permits on file · (903) 593-5221
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Barrow-Shaver Resources Co. |
| Production reports | Barrow-Shaver Resources Co.through Mar 2015 |
| Latest permit | GMT Exploration Co Texas, LLCJul 27, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,600
- total depth, ft
- 1
- permits on file
- Jul 27, 2006
- last permit issued
- Nov 16, 2006
- completed
- 0
- cumulative oil, bbl
- 535K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2006 THROUGH Jul 2025
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 16, 2006
- Shut in
- —
- Plugged
- Mar 6, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Garrison G-6-223983 | Naconiche Creek (Rod.-TP Cons.) | Barrow-Shaver Resources Co. | 1 | 0 | 535K | Sep 2006 – Jul 2025 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1GMT Exploration Co Texas, LLCSep 2006 → May 2011
- 2Barrow-Shaver Resources Co.Mar 2015 → Mar 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 623303-99 | Drill | GMT Exploration Co Texas, LLC | Jul 26, 2006 | Jul 27, 2006 | Aug 12, 2006 | 9,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-223983 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 360 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| BMA | 6,038 | -5,678 |
| Bexar MKR | 6,382 | -6,022 |
| James LimeJAMES | 6,528 | -6,168 |
| Sligo | 6,779 | -6,419 |
| Travis Peak | 7,213 | -6,853 |
| Cotton Valley | 9,390 | -9,030 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,433 | 8,846 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,298 | 11 | 140 S |
| 5.5 | 9,500 | 7.875 | 968 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 23, 2007 | Dec 21, 2006 | Yes |
| 00 | Jan 25, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-34016 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-34016 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.