WELL · 42-401-34096 · DISTRICT 6

Dillon J.A. Gas Unit #1 #4

Y

Rusk County · Minden (Cotton Valley Cons.) field · Producing  · Vertical

Dillon J.A. Gas Unit #1 #4 (API 42-401-34096) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed January 16, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued October 11, 2006, permitted to 11,000 ft.

It was permitted by Exco Resources, Inc. and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.

Completion filings report 5 formation tops, including BMA, James Lime, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

TGNR Gulf Coast LLC

Permitted by Exco Resources, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTGNR Gulf Coast LLC
Production reportsTGNR Gulf Coast LLCthrough Apr 2026
Latest permitExco Resources, Inc.Oct 11, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Oct 11, 2006
last permit issued
Jan 16, 2007
completed
0
cumulative oil, bbl
439K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 16, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dillon, J.A. Gas Unit #1 G-6-225479Minden (Cotton Valley Cons.)TGNR Gulf Coast LLC10439KJan 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 9,205 · prior 12 8,590(+7%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Resources, Inc.Jan 2007 → Mar 2007
  2. 2Exco Partners Operating Ptshp LPApr 2007 → Jun 2008
  3. 3Exco Operating Company, LPJul 2008 → May 2011
  4. 4Archon Resources LLCJun 2011 → Jan 2015
  5. 5Cci Gulf Coast Upstream LLCFeb 2015 → Jan 2021
  6. 6TGNR Gulf Coast LLCFeb 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
627321-99DrillExco Resources, Inc.Oct 10, 2006Oct 11, 2006Nov 20, 200611,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-225479————

Formation tops

As filed on W-2/G-1. Subsea from 445 ft elevation.Download CSV →

FormationMD ftSubsea
BMA6,284-5,839
James Lime6,755-6,310
Travis Peak7,292-6,847
Cotton ValleyCOTTON VALLEY "B" LIME9,350-8,905
Cotton ValleyCOTTON VALLEY TAYLOR10,443-9,998
Bossier10,650-10,205

Perforations

Perforated and open-hole intervals.

FromToType
10,07010,162Perforated
10,45710,575Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
167720—
8.6251,17511395 S
4.510,7557.8751,395 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 2007Mar 7, 2007Yes
00Mar 23, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40134096, documented in the API reference.