WELL · 42-401-34171 · DISTRICT 6

Brightwell GU #2

Y

Rusk County · Minden (Cotton Valley Cons.) field · Producing  · Vertical

Brightwell GU #2 (API 42-401-34171) is a well in Rusk County operated by Jandar Exploration L. C., completed March 21, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 18, 2006, permitted to 11,300 ft.

It was permitted by Peoples Energy Prod.-TX, L.P. and has since transferred to Jandar Exploration L. C. on the wellbore schedule.

Completion filings report 6 formation tops, including Glen Rose, James Lime, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Jandar Exploration L. C.

Permitted by Peoples Energy Prod.-TX, L.P.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Jun 4, 2026 · 5 permits on file · (903) 658-3939

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJandar Exploration L. C.
Production reportsJandar Exploration, L. C.through Apr 2026
Latest permitPeoples Energy Prod.-TX, L.P.Dec 18, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,300
total depth, ft
1
permits on file
Dec 18, 2006
last permit issued
Mar 21, 2007
completed
0
cumulative oil, bbl
519K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Brightwell GU G-6-227974Minden (Cotton Valley Cons.)Jandar Exploration, L. C.10519KMar 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 2,970 · prior 12 2,167(+37%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Peoples Energy Prod.-TX, L.P.Mar 2007 → Sep 2007
  2. 2Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
  3. 3EL Paso E & P Company, L. P.Jan 2011 → Oct 2011
  4. 4NFR Energy, LLCNov 2011 → Jan 2013
  5. 5Sabine Oil & Gas LLCFeb 2013 → Mar 2015
  6. 6Sabine Oil & Gas CorporationApr 2015 → Aug 2023
  7. 7Fortune Resources LLCNov 2023 → May 2024
  8. 8Jandar Exploration, L. C.Aug 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
630644-99DrillPeoples Energy Prod.-TX, L.P.Dec 18, 2006Dec 18, 2006Jan 25, 200711,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-227974————

Formation tops

As filed on W-2/G-1. Subsea from 440 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose4,760-4,320
James Lime6,883-6,443
PettitPETTET7,128-6,688
Travis Peak7,427-6,987
B/CV B Lime9,450-9,010
CV Taylor10,570-10,130

Perforations

Perforated and open-hole intervals.

FromToType
10,69310,701Perforated
10,70510,707Perforated
10,73110,739Perforated
10,82810,834Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,33511403 S
4.511,0527.8751,759 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 17, 2007May 18, 2007Yes
00Jul 13, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40134171, documented in the API reference.