WELL · 42-401-34227 · DISTRICT 6

Wesson GU #7

Y

Rusk County · Henderson E. (Cotton Valley) field · Temp Abandoned  · Vertical

Wesson GU #7 (API 42-401-34227) is a well in Rusk County operated by Permian Natural Resources, completed May 18, 2007 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued February 14, 2007, permitted to 11,600 ft.

It was permitted by Peoples Energy Prod.-TX, L.P. and has since transferred to Permian Natural Resources on the wellbore schedule.

Completion filings report 6 formation tops, including BMA, James Lime, Pettit, Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Permian Natural Resources

Permitted by Peoples Energy Prod.-TX, L.P.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Jan 5, 2026 · (903) 245-7969

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePermian Natural Resources
Production reportsSabine Oil & Gas Corporationthrough Aug 2023
Latest permitPeoples Energy Prod.-TX, L.P.Feb 14, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,600
total depth, ft
1
permits on file
Feb 14, 2007
last permit issued
May 18, 2007
completed
0
cumulative oil, bbl
245K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 18, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Wesson GU G-6-228829Henderson, E. (Cotton Valley)Permian Natural Resources10245KMay 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Peoples Energy Prod.-TX, L.P.May 2007 → Sep 2007
  2. 2Coronado Energy E&P Company, LLCOct 2007 → Dec 2010
  3. 3EL Paso E & P Company, L. P.Jan 2011 → Oct 2011
  4. 4NFR Energy, LLCNov 2011 → Jan 2013
  5. 5Sabine Oil & Gas LLCFeb 2013 → Mar 2015
  6. 6Sabine Oil & Gas CorporationDec 2015 → Aug 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
633429-99DrillPeoples Energy Prod.-TX, L.P.Feb 13, 2007Feb 14, 2007Apr 12, 200711,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-228829————

Formation tops

As filed on W-2/G-1. Subsea from 430 ft elevation.Download CSV →

FormationMD ftSubsea
BMA6,555-6,125
James LimeJAMES LM7,020-6,590
PettitPETTET7,260-6,830
Pettit7,260-6,830
Travis Peak7,536-7,106
B CV B LM9,508-9,078
CV Taylor10,642-10,212

Perforations

Perforated and open-hole intervals.

FromToType
10,62610,694Perforated
10,70910,792Perforated
10,90810,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,40011428 S
4.511,0977.8751,662 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 21, 2007Jun 28, 2007—
00Aug 14, 2007Jun 18, 2007Yes
00Aug 9, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40134227, documented in the API reference.