WELL · 42-401-34318 · DISTRICT 6

Kangerga B #1

Plugged

Rusk County · Minden (Travis Peak Cons.) field  · Vertical

Kangerga B #1 (API 42-401-34318) is a plugged well in Rusk County, plugged November 7, 2024, last operated by National Onshore LP.

The RRC has issued one drilling permit, issued May 12, 2007, permitted to 14,000 ft.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), B Massive Anhydrite, Travis Peak, Base 'B' Lime.

Its 2 leases have reported 71 barrels of oil and 310K mcf of gas since July 2007, last reporting in November 2024. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

National Onshore LP

Oklahoma City, OK · P-5 Y, filed May 8, 2009 · 62 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNational Onshore LP
Production reportsSabine Oil & Gas Corporationthrough Aug 2024
Latest permitNational Onshore LPMay 12, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
May 12, 2007
last permit issued
Sep 23, 2007
completed
71
cumulative oil, bbl
310K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Nov 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 23, 2007
Shut in
—
Plugged
Nov 7, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kangerga "B" G-6-230578Minden (Cotton Valley Cons.)Sabine Oil & Gas Corporation10297KJul 2007 – Nov 2024
Kangerga "B" O-6-14701Minden (Travis Peak Cons.)National Onshore LP17113.5KSep 2007 – Mar 2008

Gas, mcf lease total

Last 12 months 0 · prior 12 1,281(-100%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1National Onshore LPJul 2007 → Mar 2008
  2. 2Sandridge Onshore, LLCApr 2008 → Jan 2012
  3. 3NFR Energy, LLCFeb 2012 → Jan 2013
  4. 4Sabine Oil & Gas LLCFeb 2013 → Mar 2015
  5. 5Sabine Oil & Gas CorporationApr 2015 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
638429-99DrillNational Onshore LPMay 4, 2007May 12, 2007May 24, 200714,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-230578————
—— O-6-14701————

Formation tops

As filed on W-2/G-1. Subsea from 450 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)BASE MASSIVE ANHYDRITE6,188-5,738
B Massive Anhydrite6,188-5,738
Travis Peak7,254-6,804
Base 'B' Lime9,393-8,943
Base B Lime9,393-8,943
Bossier10,668-10,218

Perforations

Perforated and open-hole intervals.

FromToType
7,2247,442Perforated
9,41610,640Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,48612.25500 S
4.510,8187.8751,190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 9, 2008Jan 11, 2008—
00Nov 27, 2007Oct 15, 2007Yes
00Nov 8, 2007Aug 29, 2007Yes
00Nov 5, 2007——
00Nov 2, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40134318, documented in the API reference.