WELL · 42-401-34646 · DISTRICT 6

Schwartz #1

Y

Rusk County · Naconiche Creek (Rod.-TP Cons.) field · Producing  · Vertical

Schwartz #1 (API 42-401-34646) is a well in Rusk County operated by Barrow-Shaver Resources CO., completed October 20, 2009 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 19, 2008, permitted to 12,000 ft.

It was permitted by Gmt Exploration CO Texas, LLC and has since transferred to Barrow-Shaver Resources CO. on the wellbore schedule.

Completion filings report 5 formation tops, including Glen Rose, James Lime, Travis Peak, Cotton Valley.

No lease production has been reported under this well’s leases.

Operator of record

Barrow-Shaver Resources Co.

Permitted by GMT Exploration Co Texas, LLC; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarrow-Shaver Resources Co.
Production reportsBarrow-Shaver Resources Co.through Apr 2026
Latest permitGMT Exploration Co Texas, LLCFeb 19, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
2
permits on file
Feb 19, 2008
last permit issued
Oct 20, 2009
completed
0
cumulative oil, bbl
250K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 20, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Schwartz G-6-243782Naconiche Creek (Rod.-TP Cons.)Barrow-Shaver Resources Co.10250KMay 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 308 · prior 12 445(-31%)

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1GMT Exploration Co Texas, LLCDec 2008 → Jun 2014
  2. 2Barrow-Shaver Resources Co.Jul 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
654577-98DrillGMT Exploration Co Texas, LLCJun 18, 2008Feb 19, 2008Feb 27, 200812,000
654577-99DrillGMT Exploration Co Texas, LLCFeb 4, 2008Feb 19, 2008Feb 27, 200811,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-243782————

Formation tops

As filed on W-2/G-1. Subsea from 384 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose4,575-4,191
James LimeJAMES6,790-6,406
Travis Peak7,460-7,076
Cotton Valley9,540-9,156
Bossier10,595-10,211
Cotton ValleyCOTTON VALLEY B LIME11,725-11,341

Perforations

Perforated and open-hole intervals.

FromToType
7,6487,778Perforated
8,2988,476Perforated
11,31011,353Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,47112.25880 S
5.510,9717.8751,925 S
3.511,6954.5200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 8, 2010Dec 7, 2009—
00Nov 23, 2009Nov 17, 2008—
00Feb 4, 2009Aug 18, 2008Yes
00Jan 12, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40134646, documented in the API reference.