WELL · 42-401-34732 · DISTRICT 6

Harrell Gas Unit No. 2 #14

N

Rusk County · Brachfield S.E. (Cotton Valley) field  · Vertical

Harrell Gas Unit NO. 2 #14 (API 42-401-34732) is a well in Rusk County operated by Tanos Exploration II LLC, completed August 9, 2008.

The RRC has issued 2 drilling permits between 2008 and 2016, permitted to 12,000 ft.

Completion filings report 7 formation tops, including Anhydrate, Anhydrite, James Lime, Pettit.

Its 2 leases have reported 1.71K barrels of oil and 479K mcf of gas since August 2008, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Tanos Exploration II LLC

Tyler, TX · P-5 Inactive, filed May 19, 2023 · 236 permits on file · (903) 597-7667

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTanos Exploration II LLC
Production reportsTanos Exploration II, LLCthrough Feb 2018
Latest permitTanos Exploration II, LLCSep 9, 2016
12,000
total depth, ft
2
permits on file
Sep 9, 2016
last permit issued
Aug 9, 2008
completed
1.71K
cumulative oil, bbl
479K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 9, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Harrell Gas Unit N0. 2 O-6-15538Oak Hill (Travis Peak)Diversified Production LLC11.71K31.9KDec 2016 – Jul 2026
Harrell Gas Unit No. 2 G-6-240440Brachfield, S.E. (Cotton Valley)Tanos Exploration II, LLC10447KAug 2008 – Dec 2016

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fidelity Explor. & Prod. Co.Aug 2008 → Nov 2015
  2. 2Tanos Exploration II, LLCDec 2015 → Feb 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
818305-99RecompletionTanos Exploration II, LLCSep 7, 2016Sep 9, 2016—9,400
659239-99DrillFidelity Explor. & Prod. Co.Apr 9, 2008Apr 24, 2008Jul 2, 200812,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-240440————
—— O-6-15538————

Formation tops

As filed on W-2/G-1. Subsea from 484 ft elevation.Download CSV →

FormationMD ftSubsea
Anhydrate6,056-5,572
Anhydrite6,056-5,572
James LimeJAMES6,686-6,202
Pettit6,920-6,436
Travis Peak7,276-6,792
Cotton Valley10,486-10,002
Bossier10,806-10,322

Perforations

Perforated and open-hole intervals.

FromToType
7,3787,522Perforated
9,5749,576Perforated
9,6139,618Perforated
9,7369,768Perforated
9,9159,920Perforated
10,01610,021Perforated
10,06810,078Perforated
10,14010,155Perforated
10,20010,205Perforated
10,26410,267Perforated
10,36510,368Perforated
10,44510,448Perforated
10,47010,473Perforated
10,56910,573Perforated
10,60910,613Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.8751,29612.25480 S
9.6251,29612.25480 S
4.510,9108.751,485 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 29, 2017Jan 4, 2017—
00Mar 3, 2010Nov 16, 2009—
00Oct 16, 2008Sep 24, 2008Yes
00Oct 13, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/40134732, documented in the API reference.