WELL · 42-401-34857 · DISTRICT 6
Turner J.W. #2
Rusk County · Oak Hill (Cotton Valley) field · Producing · Directional
Turner J.W. #2 (API 42-401-34857) is a well in Rusk County operated by Tgnr Gulf Coast LLC, completed September 28, 2008 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued July 25, 2008, permitted to 11,300 ft.
It was permitted by Exco Operating Company, LP and has since transferred to Tgnr Gulf Coast LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Cv V-Lime, Taylor, Bossier.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Exco Operating Company, LP; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Nov 4, 2025 · (844) 888-9549
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TGNR Gulf Coast LLC |
| Production reports | TGNR Gulf Coast LLCthrough Apr 2026 |
| Latest permit | Exco Operating Company, LPJul 25, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,300
- total depth, ft
- 1
- permits on file
- Jul 25, 2008
- last permit issued
- Sep 28, 2008
- completed
- 0
- cumulative oil, bbl
- 653K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 28, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Turner, J.W. G-6-243124 | Oak Hill (Cotton Valley) | TGNR Gulf Coast LLC | 1 | 0 | 653K | Sep 2008 – Jul 2026 |
Gas, mcf lease total
Last 12 months 13,927 · prior 12 11,288(+23%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exco Operating Company, LPSep 2008 → May 2011
- 2Archon Resources LLCJun 2011 → Aug 2014
- 3Cci Gulf Coast Upstream LLCSep 2014 → Jan 2021
- 4TGNR Gulf Coast LLCFeb 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 665960-99 | Drill | Exco Operating Company, LP | Jul 2, 2008 | Jul 25, 2008 | Jul 30, 2008 | 11,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-243124 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 487 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,814 | 11,126 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,279 | 11 | 419 S |
| 4.5 | 11,252 | 7.875 | 1,140 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 9, 2009 | Nov 24, 2008 | Yes |
| 00 | Dec 17, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-401-34857 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-401-34857 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/40134857, documented in the API reference.